Monday, January 9, 2012

MERALCO Maintenance Schedule for January 9 - 15, 2012 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for
January 9 to 15, 2012. This serves as a general information guide and
should not be directly construed as an interruption advisory to the e-mail
recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


MONDAY TO TUESDAY, JANUARY 9 - 10, 2012
MANILA (PACO)
BETWEEN 11:30PM AND 11:59PM (MON., 01/09/12) AND THEN BETWEEN 3:00AM
AND 3:30AM (TUE., 01/10/12) – PORTION OF CIRCUIT STA. ANA 12VN
Portion of Pedro Gil St. from Meralco – Sta. Ana substation
along Jesuitas St. to Pres. Quirino Ave.

BETWEEN 11:30PM (MON., 01/09/12) AND 3:30AM (TUE., 01/10/12) –
PORTION OF CIRCUIT STA. ANA 12VN
The whole of Fabie Estate Subd.

REASON: Replacement of rotten wood pole along Pedro St. cor. Main
St., Fabie Estate in Paco, Manila.

TUESDAY TO WEDNESDAY, JANUARY 10 - 11, 2012
QUEZON CITY (CUBAO)
BETWEEN 11:30PM (TUE., 01/10/12) AND 4:30AM (WED., 01/11/12) –
PORTION OF CIRCUIT KAMUNING 45VP
Portion of Yale St. from Adelina Condominium to Yale Appartelle
in Bgy. E. Rodriguez.

REASON: Replacement of rotten pole along Yale St. in Bgy. E.
Rodriguez, Cubao, Quezon City.

THURSDAY, JANUARY 12, 2012
BATANGAS PROVINCE (BATANGAS CITY; AND SAN PASCUAL)
BETWEEN 9:00AM AND 9:30AM – PORTION OF CIRCUIT BOLBOK 325ZV
Portion of Batangas City – San Pascual National Road from
Meralco – Bolbok substation to and including Chevron Philippines and
Sarmiento Road in Bgy. Danglayan, San Pascual; AMA Computer College;
Happy Valley Homes, Velasquez Subd., Peñafrancia Subd., Sto. Niño
Village; Salvador, Tambobong and Dimacuha Sts. in Bgys. Sta. Rita
Karsada and Bolbok, Batangas City.

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT BOLBOK 325ZV
Along Dimatactac Road including Sitio Hangkaan, Bgys. Laurel,
Bayanan, Padre Castillo and Pook ni Banal in San Pascual.
Along Caltex Road from Batangas City – San Pascual National
Road to Meralco Road including Bgy. Villa Mercedez Subd., Vista De
Oro Subd., Villa Jems Subd., Sitio Sta. Rita Ilaya; and M. Mendoza
St. in Bgy. Sta. Rita Karsada; Bgys. Banaba West and Banaba South,
Batangas City.
Lourdes Subd., Batangas Heights Subd., Batangas Country Club
and Rimas St. in Bgy. Bolbok, Batangas City.

REASON: Line reconstruction works along Batangas City – San
Pascual National Road in Bgy. Bolbok, Batangas City,
Batangas Province.





MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone
nos. 16211 / 631-1111, fax nos. 1622-8554 / 1622-8556, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph



"Happy New Year to all!"
- From MERALCO Call Center - Technical Assistance Team -




Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.