Saturday, January 5, 2013

MERALCO Maintenance Schedule for January 7 - 13, 2012 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for
January 7 to 13, 2013. This serves as a general information guide and
should not be directly construed as an interruption advisory to the e-mail
recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


TUESDAY TO WEDNESDAY, JANUARY 8 – 9, 2013
LAGUNA (STA. ROSA CITY)
BETWEEN 11:00PM AND 11:30PM (TUE., 01/08/13) AND THEN BETWEEN 2:30AM
AND 3:00AM (WED., 01/09/13) – PORTIONS OF CIRCUIT BALIBAGO 42XV
Portion of Biñan - Sta. Rosa National Highway from near Rizal
Blvd. to SM City - Sta. Rosa including Florenceville Subd., Villa Oro
Subd.; Robinsons Place - Sta. Rosa, New Sinai - MDI Hospital,
Mariposa Inn, Homexpo Builders Depot, Ice Land Enterprises and New
Sinai School and Colleges in Bgy. Tagapo.
Portion of Biñan - Sta. Rosa National Highway from Metro Gate
Sta. Rosa Subd. to Balibago Road including Felix Reyes St., Puroks 2
& 3, Buena Perlas Subd. Phase 2, Buena Rosa Homes Subd. Phases 1 & 3,
Corinthian Homes Subd., Garden City Subd. Phase 4, Lakeshore Homes
Subd., Rosa Subd., Rosemont Ville Subd., Sitio Iraq, Sta. Rosa Garden
Villas II, Sta. Rosa Love Homes Subd., Zeramyr Subd. Phase 2,
Honorville Subd.; Centennial Gardens Cemetery, Balibago High School,
Pacific Perlite Factory, Active Industrial, Bundy Pacific Tubing,
Calypso Hotel, Phoenician Memorial Chapel and Crematory, South
Supermarket, Aycafil Industrial, Circle Freight International and R.
M. Foods in Bgys. Balibago, Labas, Macabling and Tagapo.

BETWEEN 11:00PM (TUE., 01/08/13) AND 3:00AM (WED., 01/09/13) –
PORTION OF CIRCUIT BALIBAGO 42XV
Portion of Biñan - Sta. Rosa National Highway from near SM Sta.
Rosa to Motorlandia in Bgy. Tagapo.

REASON: Relocation of facilities affected by DPWH road widening
project along Biñan - Sta. Rosa National Highway in Bgy.
Tagapo, Sta. Rosa, Laguna.

THURSDAY, JANUARY 10, 2013
MAKATI CITY
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM –
PORTION OF CIRCUIT LEGASPI 435RA
One Salcedo Place along L. P. Leviste St. (Alfaro) in Salcedo
Village, Bgy. Bel-Air.
Portion of San Agustin St. from Gammon Center to and including
The Pearl Bank Center, Vernida IV, Cosmopolitan Tower Condominium,
The Cordova, LPL Center, One Lafayette Square, Liroville Condominium
and CCH Bldg in Salcedo Village, Bgy. Bel-Air.

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT LEGASPI 435RA
Portion of Sedeno St. from Paseo De Roxas St. to Valero St.
including PS Bank Center Bldg. and 88 Corporate Center Bldg. in
Salcedo Village, Bgy. Bel-Air.

REASON: Line reconstruction works along Valero and Sedeño Sts. in
Salcedo Village, Makati City.

FRIDAY, JANUARY 11, 2013
CAVITE (MARAGONDON; NAIC; AND TERNATE)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 5:00PM AND 6:00PM – THE
WHOLE OF CIRCUIT PUERTO AZUL 32XX – TERNATE 32ZO
Portion of Caylabne Drive from Meralco – Puerto Azul substation
to Governor's Drive including Bgys. San Jose, Sapang I & II in
Ternate.
Portion of Naic – Ternate Road from H. Ventura St. to and
including Bgy. Labac in Naic; Ternate town proper, Bgys. San Juan and
San Jose, Ternate.
Bgys. Pinagsanhan I & II in Maragondon.

REASON: Maintenance works inside Meralco - Puerto Azul
substation.

SATURDAY TO SUNDAY, JANUARY 12 – 13, 2013
CAVITE (DASMARIÑAS CITY; AND GEN. TRIAS)
BETWEEN 11:00PM AND 11:59PM (SAT., 01/12/13) AND THEN BETWEEN 8:00AM
AND 9:00AM (SUN., 01/13/13) – PORTION OF CIRCUIT ABUBOT 32XZ
Portion of Don Placido Campos Road and Camerino Ave. from Mary
Cris Complex to near LTO Dasmariñas City including Sunnydale Subd.,
Goldenville 2 Subd., Greensborough Subd., Dexterville Subd. and
Parkplace Country Homes; Bgys. Sabang in Dasmariñas City.

BETWEEN 12:30AM AND 12:45AM AND THEN BETWEEN 5:00AM AND 5:15AM (SUN.,
01/13/13) – PORTION OF CIRCUITS ABUBOT 32XZ AND 38XZ
Portion of Gen. Emilio Aguinaldo Highway from Meralco – Abubot
substation to Camerino Ave. in Bgy. Burol Main, Dasmariñas City.

BETWEEN 12:01AM AND 8:00AM (SUN., 01/13/13) – PORTION OF CIRCUIT
ABUBOT 32XZ
Portion of Don Placido Campos Road from Sunrise Hills Subd. to
and including Goldenville 1 Subd. and Dasmariñas Townsville Subd. in
Bgy. Sabang, Dasmariñas City.
Portion of Arnaldo Highway from Sitio Elang to near C. M. Delos
Reyes Ave. including Academy of St. John, San Antonio Subd.,
Paramount Homes, ACM Woodstock Homes, Grand Riverside Subd.,
Camachile Subd., Parklane Subd., San Gabriel Rice Mill; Bgys.
Navarro, Santiago, Pasong Camachile 1 & 2, San Francisco, Santiago
and Sta. Clara in Gen. Trias.

REASON: Conversion of portion of 13.8kV circuit Abubot 32XZ to
34.5kV electrical system.




MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone
nos. 16211 / 631-1111, fax nos. 1622-8554 / 1622-8556, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph



Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.