Attached is the schedule of our pre-arranged power interruptions for April
22 to 28, 2013. This serves as a general information guide and should not
be directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


MONDAY, APRIL 22, 2013
CAVITE (TRECE MARTIREZ CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT SILANG 32WS
Sampaguita Village Phases I & IV and St. Joseph Village in Bgy.
Inocencio.

REASON: Line conversion works inside Sampaguita Village and St.
Joseph Village, Bgy. Inocencio, Trece Martirez City,
Cavite Province.

TUESDAY TO WEDNESDAY, APRIL 23 – 24, 2013
QUEZON CITY
BETWEEN 11:30PM (TUE., 04/23/13) AND 4:30AM (WED., 04/24/13) –
PORTION OF CIRCUIT CUBAO 46VQ
Portion of Col. Bonny Serrano Ave. (Santolan Road) from 10th
Ave. to near Epifanio Delos Santos Ave. (EDSA) including 8th and 5th
Aves.; C D Interiors, AFP Retirement Benefits System (AFP-RSBS)
Bldg., The Armed Forces and Police Mutual Benefit Association
(AFPMBAI) Bldg., AFP General Insurance Corp. and AA Aluminum in
Murphy, Bgy. Socorro.

REASON: Line reconductoring works along Col. Bonny Serrano Ave.
in Murphy, Bgy. Socorro, Quezon City.

THURSDAY, APRIL 25, 2013
**MAKATI CITY
BETWEEN 1:00AM AND 6:00AM – PORTION OF CIRCUIT NEW ROCKWELL 412VV –
PANDACAN 43M
Portion of J. P. Rizal Ave. from Atty. J. D. Villena St. to
Meralco – New Rockwell substation in Bgy. Guadalupe Viejo.

REASON: Construction of new pole and line reconstruction works
along Coronado St. in Bgy. Hulo, Mandaluyong City.

BULACAN (BALIUAG)
BETWEEN 8:00AM AND 8:30AM – PORTION OF CIRCUITS BALIWAG 314YW AND
315YW
Portion of Doña Remedios Trinidad Highway from Meralco –
Baliwag substation to Guzman St. including Hyundai – Baliuag and
Living Angels Christian Academy in Bgys. Pagala and Concepcion.
Portion of J. P. Rizal St. from Tarcan – Makihabang Road to and
including CVC Grocery, BDO – Baliuag, Marian College of Baliuag, D &
E Bldg., Baliuag University, Crownwood Furniture and PNB; Cunanan, P.
Angeles, Campupot, Tumana, Balagtas, J. M. Basa, La Rosa Santiago,
Gumamela, Gil Carlos, S. Tagle, J. Buizon and Lopez Jaena Sts. in
Bgys. Poblacion, Concepcion, San Jose, Sto. Cristo and Sta. Barbara.

REASON: Unloading of circuit Baliwag 315YW in preparation for
unloading of circuit Baliwag 321YW.

SATURDAY, APRIL 27, 2013
**VALENZUELA CITY
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 5:30AM AND 6:00AM –
PORTION OF CIRCUIT BAGBAGUIN 415YZ
Portion of Bagbaguin Road from G. Molina St. (707 Compound
Road) to North Luzon Expressway (NLEX) East Service Road including
IRC Compound; Jollibee, BJ Mercantile, Baliwag Mahogany, Engle Heart
Manufacturing, Galvan Packaging, Hung Yih Knitting Mill, Tempco
Glass, Alen International Industrial Corp., Ecological Packaging
Philippines, Electroweld, Goodyear Industrial, Metalex Wire
Industries, Ocean Light Compound, Paulkim Plastic Factory, Regan
Industrial Sales, Three Coins Plastic Manufacturing, WC Commercial,
Grace Park Industries (GPI) and MMDA Organized Bus Route (OBR)
Terminal in Bgys. Bagbaguin and Paso De Blas.

BETWEEN 5:30AM AND 6:00AM – PORTION OF CIRCUIT BAGBAGUIN 415YZ
Portion of G. Angeles and Sto. Rosario Sts. from near Apolonia
St. to Espiritu St. including Metrovilla Centre Village, Florentino,
Modesto and Servando Sts.; AI Rubber Phils., Calypso Plastic Center,
Asian Plastic Center, Cityplas Plastic, Rolex Plastic Manufacturing,
RMPC Plastics Manufacturing and Tecno Plas Manufacturing in Bgy.
Mapulang Lupa.

BETWEEN 12:01AM AND 6:00AM – PORTION OF CIRCUIT BAGBAGUIN 415YZ
Portion of North Luzon Expressway (NLEX) East Service Road from
Bagbaguin Road to G. Angeles St. including De Castro Subd., Purok 4;
Puregold – Paso De Blas, Sankyo Metal Industries, Fortune Plastic,
Uniserve Intergrated Phils., Vetamax Textile Factory and Zomax
Industries in Bgys. Paso De Blas and Mapulang Lupa.
Portion of G. Angeles, Apolonia and F. Bautista Sts. from North
Luzon Expressway (NLEX) East Service Road to Candido St. including
Home Centrum Subd., Kabatuhan St.; LC Builders and Developers, M & T
Food Industries, Median Container Factory, Metro Container Factory
and Batata Food Products in Bgys. Paso De Blas and Mapulang Lupa.

REASON: Line reconstruction works along North Luzon Expressway
(NLEX) East Service Road, G. Angeles, Apolonia and F. Bautista Sts. in
Bgys. Paso De Blas and Mapulang Lupa, Valenzuela City.




MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph




**Revised PPI (revisions already incorporated)
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.