Attached is the schedule of our pre-arranged power interruptions for June 3
to 9, 2013.  This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
                           MAINTENANCE SCHEDULE
	To  carry  out  necessary  maintenance and upgrading works on various
MERALCO  distribution  facilities,  electric  service  will  be temporarily
interrupted on the following dates and places:
                           TUESDAY, JUNE 4, 2013
LAGUNA (CALAMBA CITY)
      BETWEEN 9:00AM AND 1:00PM – PORTION OF CIRCUIT CANLUBANG 52XE
            Avida Setting Nuvali Subd. and Treveia Subd. in Bgy. Canlubang.
      REASON: 	Relocation  of  facilities  along Montecito Road in Bgy.
                  Canlubang, Calamba City, Laguna.
                          WEDNESDAY, JUNE 5, 2013
BULACAN (BALIUAG; AND SAN RAFAEL)
      BETWEEN  12:01AM  AND  12:30AM  AND  THEN BETWEEN 4:30AM AND 5:00AM –
      PORTION OF CIRCUIT BALIWAG 313YW
            Portion  of  Doña  Remedios Trinidad Highway from near Milflora
      Homes  in  Bgy.  Sabang,  Baliuag  to  and  including Bgys. Sampaloc,
      Capihan, Pinacpinacan and Ulingao in San Rafael.
            Portion  of  Cagayan  Valley  Road  and A. Mabini St. from Doña
      Remedios  Trinidad  Highway  in Bgy. Sampaloc, San Rafael to Guererro
      St. including Dr. Gonzales St. in Bgy. Sabang, Baliuag.
      BETWEEN  12:01AM  AND  5:00AM – PORTION OF CIRCUITS BALIWAG 313YW AND
      322YW
            Portion  of  B.  S.  Aquino  Ave.  from  Doña Remedios Trinidad
      Highway  to  near  J.  M. Basa St. including Maligaya, F. Lara, G. P.
      Cruz,  M.  Ponce  and  Plaridel  Sts.; Doña Enriqueta Subd., Fernando
      Subd.,  New  Frontier  Subd., Zones 1, 2 & 5, Villa Cecilia Subd. and
      Emel  Subd.  in Bgys. Bagong Nayon, Poblacion, Sto. Cristo, Subic and
      Tibag in Baliuag.
      REASON: 	Line  re-conductoring works along Doña Remedios Trinidad
                  Highway and B. S. Aquino Ave. in Baliuag, Bulacan.
                          THURSDAY, JUNE 6, 2013
LAGUNA (NAGCARLAN; RIZAL; AND SAN PABLO CITY)
      BETWEEN 8:00AM AND 9:00AM – PORTION OF CIRCUIT BOTOCAN 41D
            Portion  of Rizal – San Pablo City National Road from Bgy. East
      Poblacion  Barangay  Hall to and including Bgys. East Poblacion, West
      Poblacion,  Tala,  Rizal, Talaga and Antipolo in Rizal; and Bgy. Sto.
      Angel, San Pablo City.
            Bgy. Banilad in Nagcarlan.
            Bgy. Entablado in Rizal.
      BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT BOTOCAN 41D
            Portion  of Rizal – San Pablo City National Road including Bgy.
      Sto. Angel Water District in Bgy. Sto. Angel, San Pablo City.
      REASON: 	Relocation  of primary line facilities along Rizal - San
                  Pablo  City  National  Road in Bgy. Sto. Angel, San Pablo
                  City, Laguna.
CAVITE (SILANG); AND LAGUNA (STA. ROSA CITY)
      BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT STA. ROSA II 42WL
            Portion  of  Sta. Rosa – Tagaytay Road from near Britanny Subd.
      to  and  including  Sitio Muzon, Bgy. Puting Kahoy in Silang, Cavite;
      Valenza  Subd., Nuvali Solenad, Nuvali Commercial Center, One Evotech
      and Nuvali Subd. in Bgy. Sto. Domingo, Sta. Rosa City, Laguna.
      REASON:	Line reconductoring works along Sta. Rosa – Tagaytay Road
                  in Bgy. Don Jose, Sta. Rosa City, Laguna.
                   FRIDAY TO SATURDAY, JUNE 7 – 8, 2013
PARAÑAQUE CITY
      BETWEEN  11:00PM AND 11:30PM (FRI., 06/07/13) AND THEN BETWEEN 3:30AM
      AND 4:00AM (SAT., 06/08/13) – PORTION OF CIRCUIT PARAÑAQUE 18ZJ
            Portion  of Quirino Ave. and Tramo St. from Meralco – Parañaque
      substation  along  Bayside  Court  St.  to  Moonshell  St.  including
      Kabihasnan,  A.  Bonifacio  and  McDonough  Sts.; Saulog Transit, CPI
      Machine Shop and Mormon Church in Bgys. Sto. Dionisio and Tambo.
      BETWEEN  11:00PM  (FRI.,  06/07/13)  AND  4:00AM  (SAT.,  06/08/13) –
      PORTION OF CIRCUIT PARAÑAQUE 18ZJ
            Portion  of J.P. Rizal St. from Quirino Ave. to Col. E. De Leon
      Sts.  including 2nd, 3rd, Dahlia, Gomburza, Rizal and Sampaguita Sts.
      in Bgy. Sto. Niño.
      REASON: 	Line  reconstruction  works  along Dr. J.P. Rizal St. in
                  Bgy. Sto. Niño, Parañaque City.
                           SUNDAY, JUNE 9, 2013
MANILA; QUEZON CITY; AND SAN JUAN CITY
      BETWEEN  8:00AM  AND  8:30AM  AND  THEN  BETWEEN 12:30PM AND 1:00PM –
      PORTION OF CIRCUITS STA. MESA 41F – STA. ANA 45VN – PANDACAN 48M; AND
      STA. MESA 44F – SAN JUAN 43VF
            Portion  of  Santol  St. from Meralco – Sta. Mesa substation to
      and  including Sociego, Silencio, Escoda and Doña Maria Sts.; Baptist
      Bible  Church,  Lotus  Academy and BPI in Sampaloc, Manila; Puray and
      Concepcion Sts. in Bgy. Santol, Quezon City.
            Portion  of  L.  Roces  and  Palanza  Sts.  from  Doña Maria to
      Zaragoza  Sts. including Tomas Arguelles and Guirayan Sts.; Arlington
      Memorial  Chapel,  CK Bldg. and Robbindale Bldg. in Bgy. Doña Imelda,
      Quezon City.
            Portion  of V. Mapa and Old Sta. Mesa Sts. from Ramon Magsaysay
      Blvd. to F. Manalo St. including City Oil Phil. in Sta. Mesa, Manila.
            Portion  of F. Manalo St. from Gen. Bautista to San Miguel Sts.
      including  Jose  Wright,  R.  Pascual, San Luis, San Mauricio and San
      Pablo Sts.; and Deeco Mfg. in Bgy. Batis, San Juan City.
            Portion  of N. Domingo St. from F. Blumentritt St. to Meralco –
      San  Juan  substation including A. Luna, Santiago, H. Lozada, Lope K.
      Santos,  J. Basa, Pinaglabanan, Dr. E. Ejercito,  Paraiso, Lactao, G.
      Reyes,  Corazon De Jesus, Josefa Drive, Lt. Artiaga, Alfonso XIII, M.
      Paterno  and  F.  Benitez;  Chowking, San Juan Elementary School, San
      Juan Municipal Hall, BPI, Cool Spot Dairy Foods, Quadrillion Mansion,
      Metrobank,  San  Juan  Medical  Center  and  Puregold – Agora, Little
      Baguio   Terraces,   St.   John  Baptist  Catholic  School  in  Bgys.
      Balong-Bato,  Corazon  De  Jesus, Isabelita, Pasadeña, Pedro Cruz and
      San Perfecto in San Juan City.
            Portion  of  Aurora  Blvd.  from  Gilmore  Ave.  to  Doña Juana
      Rodriguez  St.  including 1st St.; Valencia Hills, F. Salon, Broadway
      Centrum, Princeton Bldg., Mercury Drug Store and Savemore Supermarket
      in Bgy. Valencia, Quezon City.
            Portion of Aurora Blvd. from F. Santos St. to near G. Reyes St.
      including  R. Lagmay and F. Antonio Sts. in Bgys. Ermitaño and Rivera
      in San Juan City.
      BETWEEN  8:00AM AND 1:00PM – PORTION OF CIRCUITS STA. MESA 41F – STA.
      ANA 45VN – PANDACAN 48M; AND STA. MESA 44F – SAN JUAN 43VF
            Portion  of  F.  Manalo  St. from E. Fernandez St. to near Gen.
      Bautista   St.   including  M.  Salvador  and  Valenzuela  Sts.;  and
      International Oil Factory in Bgy. Batis, San Juan City.
      REASON: 	Line  maintenance  works  and  installation of new poles
                  along F. Manalo St. in Bgy. Batis, San Juan City.
      MERALCO  exerts all efforts to restore electric service as scheduled.
However,  there  are  instances  when  due  to  unavoidable  circumstances,
restoration may extend beyond the published schedule.
      For more information, please contact our CALL CENTER at telephone no.
16211  /  631-1111,  fax  no.  1622-8554  /  632-8554,  or  e-mail  address
callcenter.tech.assist@meralco.com.ph.  For faster resolution of inquiries,
please  use  the  Bill  ID  Number  or  Service Identification Number (SIN)
indicated in your electric bills.
      For  those  who  prefer  to  receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
                VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
                            www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative.  If erroneously sent or received, please do not open and delete the same from your system.  Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
Friday, May 31, 2013
Friday, May 24, 2013
MERALCO Maintenance Schedule for May 27 - June 2, 2013 (Grp2) (Sent by: Janice V. De Asis)
=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 27
to June 2, 2013. This serves as a general information guide and should not
be directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY TO WEDNESDAY, MAY 28 – 29, 2013
PASAY CITY
BETWEEN 11:00PM AND 11:30PM (TUE., 05/28/13) AND THEN BETWEEN 4:30AM
AND 5:00AM (WED., 05/29/13) – PORTION OF CIRCUIT CBP-1A 415RF – PASAY
42U
Portion of Epifanio Delos Santos Ave. (EDSA) and Taft Ave. from
Aurora Blvd. (Tramo) to Park Ave. including Jollibee (EDSA – Taft),
Galleria Baclaran Shopping Center and Sunnyline Bldg.
Portion of F. B. Harrison St. from Capt. Ambo St. to and
including Puregold – Baclaran, ITM Shopping Mall and INC – Baclaran
Compound.
BETWEEN 11:00PM (TUE., 05/28/13) AND 5:00AM (WED., 05/29/13) –
PORTION OF CIRCUIT CBP-1A 415RF – PASAY 42U
Along Capt. Ambo St. from Park Ave. to F. B. Harrison St.
including Baclaran LRT Terminal Plaza.
REASON: Replacement of rotten pole along Capt. Ambo St. in Pasay
City.
QUEZON CITY (CUBAO)
BETWEEN 11:30PM (TUE., 05/28/13) AND 4:30AM (WED., 05/29/13) –
PORTION OF CIRCUIT CUBAO 46VQ
Portion of Col. Bonny Serrano Ave. (Santolan Road) from near 13
th Ave. to and including AMWSLAI Bldg. in Bgy. Socorro.
REASON: Line reconductoring works along Col. Bonny Serrano Ave.
(Santolan Road) near 14th Ave. in Bgy. Socorro, Cubao,
Quezon City.
WEDNESDAY, MAY 29, 2013
BATANGAS (STO. TOMAS)
BETWEEN 8:00AM AND 5:00PM – THE WHOLE OF CIRCUIT MAKBAN 56MB
St. Thomas Paper Corp. in Bgy. San Felix.
REASON: NGCP maintenance works inside NGCP – Makban substation.
THURSDAY TO FRIDAY, MAY 30 - 31, 2013
MANILA (QUIAPO; SAMPALOC; AND SAN MIGUEL)
BETWEEN 11:00PM AND 11:45PM (THU., 05/30/13) AND THEN BETWEEN 4:15AM
AND 5:00AM (FRI., 05/31/13) – PORTION OF CIRCUIT TEGEN 513B
Portion of Mendiola St. from J. P. Laurel to Legarda St.
including Concepcion Aguila, 1st through 5th Sts.; College of Holy
Spirit, San Beda College, Centro Escolar University, KFC – San Beda,
Chowking Mendiola, PNB – Legarda and McDonald's Restaurant - Mendiola
in San Miguel.
Portion of Claro M. Recto Ave. from Legarda to Coromina Sts.
including University of the East, San Sebastian College, BPI – Recto,
KFC – Recto, National Book Store, Informatics, ABE Int'l College, BDO
– Recto, Metrobank – Recto, STI –Recto, Mang Inasal Restaurant and
Cartimar Shopping Center in Sampaloc.
Portion of Bilibid Viejo and G. Puyat Sts. from S. H. Loyola
St. (Lepanto) to Quezon Blvd. including Carpena, Matapang, Progreso,
San Sebastian and Severino Sts. in Quiapo.
Portion of Legarda St. from Mendiola St. to near Arlegui St.
including San Rafael and Cruzada Sts.; Samson Institue of Technology,
Arellano University, Dept. of Social Welfare and Dev., Mapa High
School and INC – San Miguel Compound in San Miguel.
BETWEEN 11:00PM (THU., 05/30/13) AND 5:00AM (FRI., 05/31/13) –
PORTION OF CIRCUIT TEGEN 513B
Portion of J. P. Laurel St. from Ycaza St. to and including
Adela, Matienza, Uli-uli, Buencamino and Minerva Sts.; St. Jude
Catholic School and JNL Dormitory in San Miguel.
REASON: Installation of new pole and relocation of facilities
along Uli – uli St. in San Miguel, Manila.
FRIDAY, MAY 31, 2013
MEYCAUAYAN CITY; AND VALENZUELA CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT MEYCAUAYAN 42YM
Portion of North Luzon Expressway (NLEX) East Service Road from
Iba Road to near R. Soriano St. including Sampaloc St.; Fidelity
Steel Manufacturing, Hi-Tech Steel Industries and RIBCO Compound in
Bgys. Libtong and Malhacan in Meycauayan City.
Portion of North Luzon Expressway (NLEX) East Service Road from
Ever Memorial Garden to near Arty Subd. including Centro St.;
Estrella Ice Plant, Jely's Development Corp., Philippine Bible
Society (PBS) Printing Plant & Warehouse, Puting Bato Post Harvest
Facility, Malinta Auction Center and R. Lapid's Chicharon & Barbeque
in Bgy. Lawang Bato, Valenzuela City.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT MEYCAUAYAN 42YM
Portion of North Luzon Expressway (NLEX) East Service Road from
R. Soriano St. to Villacor Subd. in Bgys. Malhacan and Langka in
Meycauayan City.
REASON: Line reconductoring works along North Luzon Expressway
(NLEX) in Bgy. Lawang Bato, Valenzuela City.
SATURDAY TO SUNDAY, JUNE 1 – 2, 2013
MAKATI CITY
BETWEEN 11:00PM (SAT., 06/01/13) AND 4:00AM (SAT., 06/02/13) –
PORTION OF CIRCUIT TAGUIG 43ZL
Portion of J. P. Rizal Ext. from Macopa to San Guillermo Sts.
including Bgys. Comembo, East Rembo, West Rembo, Pembo and Rizal.
REASON: Upgrading of facilities along J. P. Rizal Ext. (Guadalupe
- Pateros Road) in Bgys. Comembo and East Rembo, Makati
City.
SUNDAY, JUNE 2, 2013
BATANGAS (BATANGAS CITY)
BETWEEN 6:00AM AND 6:00PM – THE WHOLE OF CIRCUITS NGCP – BOLBOK 32ZZ
AND 33ZZ; AND MAHABANG PARANG 32WZ
Sitio Santa Rita Ilaya in Bgys. Santa Rita Karsada and Soro
Soro Karsada.
Portion of Batangas City – San Jose National Road from Meralco
– Mahabang Parang substation to and including Sitios Kanluran, Ilaya
and Ibaba, Bgys. Bucal, Concepcion and Mahabang Parang.
REASON: NGCP maintenance works along NGCP – Batangas 69kV
transmission lines.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 27
to June 2, 2013. This serves as a general information guide and should not
be directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY TO WEDNESDAY, MAY 28 – 29, 2013
PASAY CITY
BETWEEN 11:00PM AND 11:30PM (TUE., 05/28/13) AND THEN BETWEEN 4:30AM
AND 5:00AM (WED., 05/29/13) – PORTION OF CIRCUIT CBP-1A 415RF – PASAY
42U
Portion of Epifanio Delos Santos Ave. (EDSA) and Taft Ave. from
Aurora Blvd. (Tramo) to Park Ave. including Jollibee (EDSA – Taft),
Galleria Baclaran Shopping Center and Sunnyline Bldg.
Portion of F. B. Harrison St. from Capt. Ambo St. to and
including Puregold – Baclaran, ITM Shopping Mall and INC – Baclaran
Compound.
BETWEEN 11:00PM (TUE., 05/28/13) AND 5:00AM (WED., 05/29/13) –
PORTION OF CIRCUIT CBP-1A 415RF – PASAY 42U
Along Capt. Ambo St. from Park Ave. to F. B. Harrison St.
including Baclaran LRT Terminal Plaza.
REASON: Replacement of rotten pole along Capt. Ambo St. in Pasay
City.
QUEZON CITY (CUBAO)
BETWEEN 11:30PM (TUE., 05/28/13) AND 4:30AM (WED., 05/29/13) –
PORTION OF CIRCUIT CUBAO 46VQ
Portion of Col. Bonny Serrano Ave. (Santolan Road) from near 13
th Ave. to and including AMWSLAI Bldg. in Bgy. Socorro.
REASON: Line reconductoring works along Col. Bonny Serrano Ave.
(Santolan Road) near 14th Ave. in Bgy. Socorro, Cubao,
Quezon City.
WEDNESDAY, MAY 29, 2013
BATANGAS (STO. TOMAS)
BETWEEN 8:00AM AND 5:00PM – THE WHOLE OF CIRCUIT MAKBAN 56MB
St. Thomas Paper Corp. in Bgy. San Felix.
REASON: NGCP maintenance works inside NGCP – Makban substation.
THURSDAY TO FRIDAY, MAY 30 - 31, 2013
MANILA (QUIAPO; SAMPALOC; AND SAN MIGUEL)
BETWEEN 11:00PM AND 11:45PM (THU., 05/30/13) AND THEN BETWEEN 4:15AM
AND 5:00AM (FRI., 05/31/13) – PORTION OF CIRCUIT TEGEN 513B
Portion of Mendiola St. from J. P. Laurel to Legarda St.
including Concepcion Aguila, 1st through 5th Sts.; College of Holy
Spirit, San Beda College, Centro Escolar University, KFC – San Beda,
Chowking Mendiola, PNB – Legarda and McDonald's Restaurant - Mendiola
in San Miguel.
Portion of Claro M. Recto Ave. from Legarda to Coromina Sts.
including University of the East, San Sebastian College, BPI – Recto,
KFC – Recto, National Book Store, Informatics, ABE Int'l College, BDO
– Recto, Metrobank – Recto, STI –Recto, Mang Inasal Restaurant and
Cartimar Shopping Center in Sampaloc.
Portion of Bilibid Viejo and G. Puyat Sts. from S. H. Loyola
St. (Lepanto) to Quezon Blvd. including Carpena, Matapang, Progreso,
San Sebastian and Severino Sts. in Quiapo.
Portion of Legarda St. from Mendiola St. to near Arlegui St.
including San Rafael and Cruzada Sts.; Samson Institue of Technology,
Arellano University, Dept. of Social Welfare and Dev., Mapa High
School and INC – San Miguel Compound in San Miguel.
BETWEEN 11:00PM (THU., 05/30/13) AND 5:00AM (FRI., 05/31/13) –
PORTION OF CIRCUIT TEGEN 513B
Portion of J. P. Laurel St. from Ycaza St. to and including
Adela, Matienza, Uli-uli, Buencamino and Minerva Sts.; St. Jude
Catholic School and JNL Dormitory in San Miguel.
REASON: Installation of new pole and relocation of facilities
along Uli – uli St. in San Miguel, Manila.
FRIDAY, MAY 31, 2013
MEYCAUAYAN CITY; AND VALENZUELA CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT MEYCAUAYAN 42YM
Portion of North Luzon Expressway (NLEX) East Service Road from
Iba Road to near R. Soriano St. including Sampaloc St.; Fidelity
Steel Manufacturing, Hi-Tech Steel Industries and RIBCO Compound in
Bgys. Libtong and Malhacan in Meycauayan City.
Portion of North Luzon Expressway (NLEX) East Service Road from
Ever Memorial Garden to near Arty Subd. including Centro St.;
Estrella Ice Plant, Jely's Development Corp., Philippine Bible
Society (PBS) Printing Plant & Warehouse, Puting Bato Post Harvest
Facility, Malinta Auction Center and R. Lapid's Chicharon & Barbeque
in Bgy. Lawang Bato, Valenzuela City.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT MEYCAUAYAN 42YM
Portion of North Luzon Expressway (NLEX) East Service Road from
R. Soriano St. to Villacor Subd. in Bgys. Malhacan and Langka in
Meycauayan City.
REASON: Line reconductoring works along North Luzon Expressway
(NLEX) in Bgy. Lawang Bato, Valenzuela City.
SATURDAY TO SUNDAY, JUNE 1 – 2, 2013
MAKATI CITY
BETWEEN 11:00PM (SAT., 06/01/13) AND 4:00AM (SAT., 06/02/13) –
PORTION OF CIRCUIT TAGUIG 43ZL
Portion of J. P. Rizal Ext. from Macopa to San Guillermo Sts.
including Bgys. Comembo, East Rembo, West Rembo, Pembo and Rizal.
REASON: Upgrading of facilities along J. P. Rizal Ext. (Guadalupe
- Pateros Road) in Bgys. Comembo and East Rembo, Makati
City.
SUNDAY, JUNE 2, 2013
BATANGAS (BATANGAS CITY)
BETWEEN 6:00AM AND 6:00PM – THE WHOLE OF CIRCUITS NGCP – BOLBOK 32ZZ
AND 33ZZ; AND MAHABANG PARANG 32WZ
Sitio Santa Rita Ilaya in Bgys. Santa Rita Karsada and Soro
Soro Karsada.
Portion of Batangas City – San Jose National Road from Meralco
– Mahabang Parang substation to and including Sitios Kanluran, Ilaya
and Ibaba, Bgys. Bucal, Concepcion and Mahabang Parang.
REASON: NGCP maintenance works along NGCP – Batangas 69kV
transmission lines.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
Friday, May 17, 2013
MERALCO Maintenance Schedule for May 20 - 26, 2013 (Grp2) (Sent by: Janice V. De Asis) (Sent by: Janice V. De Asis)
=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 20
to 26, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY, MAY 21, 2013
LAGUNA (STA. ROSA)
BETWEEN 12:01AM AND 3:00AM – PORTION OF CIRCUIT BALIBAGO 41XV
Portion of Felix Reyes St. from near South Luzon Expressway
(SLEX) in Bgy. Pulong Sta. Cruz to and including Monde – Nissin,
Meridian Industrial Complex; and J. B. Village 2 in Bgy. Balibago.
Portion of San Lorenzo Road from Felix Reyes St. to and
including Enchanted Kingdom, Waltermart, Total Gas Station; San
Lorenzo South Subd., Terra Fortuna Phase 2 Subd., Villa De Toledo
Subd., Villa Esmeralda Subd. and Villa Segovia Subd in Bgy. Malitlit.
REASON: Line reconstruction works along Felix Reyes St., Bgy.
Balibago, Sta. Rosa, Laguna.
BULACAN (ANGAT; AND NORZAGARAY)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 1:00PM AND 2:00PM – THE
WHOLE OF CIRCUIT ANGAT 32YT
Portion of M. Fernando and A. Payumo Sts. from Meralco – Angat
substation near Encanto Road in Bgy. Sta. Cruz, Angat to and
including Villarama St., Calle Putol, Sitios Bato, Bulalo, Coral,
Gulod, Kanyakan and Palale in Bgys. Bangkal, Bitungol, Matictic,
Poblacion and Tigbe in Norzagaray.
REASON: Preventive maintenance and testing works inside Meralco -
Angat substation.
CAVITE (NAIC; AND TANZA)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 7:00PM AND 8:00PM – THE
WHOLE OF CIRCUIT TANZA 32ZW
Portion of Antero Soriano Highway from Naic – Tanza Municipal
boundary in Bgy. Munting Mapino in Naic to Meralco - Tanza substation
including Calibuyo Elementary School, Halayhay Elementary School;
Villa Juanita Subd., Glowingfield Village, Greenville Homes,
Springfield View Subd.; Bgys. Amaya 1, Calibuyo, Halayhay, Lambingan,
Timalan Lontoc and Sahud Ulan in Tanza.
REASON: Preventive maintenance and testing works inside Meralco –
Tanza substation.
THURSDAY, MAY 23, 2013
BULACAN (NORZAGARAY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT ANGAT 32YT
Portion of Norzagaray Provincial Road from A. Payumo St. to
and including Bgy. Bitungol; T. Gener and Villarama Sts. in Bgy.
Poblacion.
REASON: Line re-conductoring and upgrading works in Bgys.
Bitungol and Poblacion in Norzagaray, Bulacan.
CALOOCAN CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT CAMARIN 433TC
El Paseo Subd., Bankers Village I Subd. and Senate Housing
Project in Bagumbong.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT CAMARIN 433TC
Franville II Subd., North Haven Condominium and Palmera Springs
Phase III in Bagumbong; Congressional Model Subd. and Sampaguita
Subd. in Camarin; and Shelterville I Subd. in Bgy. Bagong Silang.
REASON: Installation of additional lightning protection devices
and line reconductoring works in Palmera Springs Subd.,
Bagumbomg, Caloocan City.
FRIDAY, MAY 24, 2013
BULACAN (HAGONOY)
BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CALUMPIT 325YQ
Purok 1-A, 2, 3, 4, 5 & 7 in Bgy. Mercado; Purok 1, 2, 3, 4 & 5
in Bgy. San Jose; Purok 1-A, 1-B, 3, 4 & 6 in Bgy. Sta. Monica; Purok
3 in Bgy. Sto. Niño.
REASON: Various maintenance and upgrading works in Bgys. Mercado,
San Jose, Sta. Monica nd Sto. Niño in Hagonoy, Bulacan.
CAVITE (TRECE MARTIRES CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TMC 1 – 37XW
Along Marcius Ave. from Trece Martires City – Indang Road to
and including Capitol Hills Subd. 1 & 2 in Bgy. Lapidario.
REASON: Partial conversion of 13.8kV circuit TMC-1 37XW to 34.5
kV circuit FCIE 42WB.
SUNDAY, MAY 26, 2013
BULACAN
BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – THE
WHOLE OF CIRCUITS ANGAT 32YT AND 36YT; AND PORTION OF CIRCUIT BALIWAG
322YW
Portion of Sulucan St. from near Malamig Road to Don Pablo
Amisola Memorial School including Claro Santos, Cenon Perez,
Francisco Ramos, Leonardo Perez and Victor De Leon Sts., Niugan and
NIA Roads, Gonzales Subd., Legarda Subd. (Purok 5), and Puroks 2 & 3
in Bgys. Bonga Mayor, Bonga Menor, Paltok and Tibagan in Bustos; and
Bgy. Niugan, Angat.
Portion of Sulucan, Fernando and Guzman Sts. from near
Basketball Court in Bgy. Donacion to near Leonardo St. in Bgy. Sta.
Cruz including Bgys. Taboc, Sulucan, Marungko, Sta. Lucia, Laog,
Banaban, Baybay, Binagbag, Donacion, Encanto, Paltok, San Roque, Sto.
Cristo and Sta. Cruz in Angat.
Bgy. Malawak in Bustos.
Bgys. Bayabas, Camachile, Pulong Sampalok and Sapang Bulak in
Doña Remedios Trinidad.
Bgy. Pinagtulayan in Norzagaray.
Bgys. Pulo, Sampaloc, Sapang Pahalang and Tukod in San Rafael.
Bgy. Casalat in San Ildefonso.
Portion of M. Fernando, Payumo and Dr. M. Pascual Sts. from
Meralco – Angat substation in Bgy. Sta. Cruz, Angat to and including
Bgys. Bangkal, Baraka, Bitungol, Matictic, Tigbe and Poblacion in
Norzagaray.
BETWEEN 2:00AM AND 2:30AM AND THEN BETWEEN 6:30AM AND 7:00AM –
PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Gov. Fortunato Halili Ave. from Meralco – Sta. Maria
substation along North Luzon Expressway in Bgy. Turo, Bocaue to near
A. Mabini St. in Bgy. Bagbaguin, Sta. Maria including Bureau of
Internal Revenue (BIR) – Revenue District Office No. 25B, Max's
Restaurant, Landbank - Sta. Maria Branch and Formix Bldg. in Bgy.
Bagbaguin, Sta. Maria.
BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Sta. Maria Bypass Road from Gov. Fortunato Halili
Ave. in Bgy. Bagbaguin to near Bgy. Sta. Clara in Sta. Maria.
REASON: Various line maintenance and construction works along
Sta. Maria Bypass Road in Bgy. Bagbaguin, Sta. Maria,
Bulacan.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 20
to 26, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY, MAY 21, 2013
LAGUNA (STA. ROSA)
BETWEEN 12:01AM AND 3:00AM – PORTION OF CIRCUIT BALIBAGO 41XV
Portion of Felix Reyes St. from near South Luzon Expressway
(SLEX) in Bgy. Pulong Sta. Cruz to and including Monde – Nissin,
Meridian Industrial Complex; and J. B. Village 2 in Bgy. Balibago.
Portion of San Lorenzo Road from Felix Reyes St. to and
including Enchanted Kingdom, Waltermart, Total Gas Station; San
Lorenzo South Subd., Terra Fortuna Phase 2 Subd., Villa De Toledo
Subd., Villa Esmeralda Subd. and Villa Segovia Subd in Bgy. Malitlit.
REASON: Line reconstruction works along Felix Reyes St., Bgy.
Balibago, Sta. Rosa, Laguna.
BULACAN (ANGAT; AND NORZAGARAY)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 1:00PM AND 2:00PM – THE
WHOLE OF CIRCUIT ANGAT 32YT
Portion of M. Fernando and A. Payumo Sts. from Meralco – Angat
substation near Encanto Road in Bgy. Sta. Cruz, Angat to and
including Villarama St., Calle Putol, Sitios Bato, Bulalo, Coral,
Gulod, Kanyakan and Palale in Bgys. Bangkal, Bitungol, Matictic,
Poblacion and Tigbe in Norzagaray.
REASON: Preventive maintenance and testing works inside Meralco -
Angat substation.
CAVITE (NAIC; AND TANZA)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 7:00PM AND 8:00PM – THE
WHOLE OF CIRCUIT TANZA 32ZW
Portion of Antero Soriano Highway from Naic – Tanza Municipal
boundary in Bgy. Munting Mapino in Naic to Meralco - Tanza substation
including Calibuyo Elementary School, Halayhay Elementary School;
Villa Juanita Subd., Glowingfield Village, Greenville Homes,
Springfield View Subd.; Bgys. Amaya 1, Calibuyo, Halayhay, Lambingan,
Timalan Lontoc and Sahud Ulan in Tanza.
REASON: Preventive maintenance and testing works inside Meralco –
Tanza substation.
THURSDAY, MAY 23, 2013
BULACAN (NORZAGARAY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT ANGAT 32YT
Portion of Norzagaray Provincial Road from A. Payumo St. to
and including Bgy. Bitungol; T. Gener and Villarama Sts. in Bgy.
Poblacion.
REASON: Line re-conductoring and upgrading works in Bgys.
Bitungol and Poblacion in Norzagaray, Bulacan.
CALOOCAN CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT CAMARIN 433TC
El Paseo Subd., Bankers Village I Subd. and Senate Housing
Project in Bagumbong.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT CAMARIN 433TC
Franville II Subd., North Haven Condominium and Palmera Springs
Phase III in Bagumbong; Congressional Model Subd. and Sampaguita
Subd. in Camarin; and Shelterville I Subd. in Bgy. Bagong Silang.
REASON: Installation of additional lightning protection devices
and line reconductoring works in Palmera Springs Subd.,
Bagumbomg, Caloocan City.
FRIDAY, MAY 24, 2013
BULACAN (HAGONOY)
BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CALUMPIT 325YQ
Purok 1-A, 2, 3, 4, 5 & 7 in Bgy. Mercado; Purok 1, 2, 3, 4 & 5
in Bgy. San Jose; Purok 1-A, 1-B, 3, 4 & 6 in Bgy. Sta. Monica; Purok
3 in Bgy. Sto. Niño.
REASON: Various maintenance and upgrading works in Bgys. Mercado,
San Jose, Sta. Monica nd Sto. Niño in Hagonoy, Bulacan.
CAVITE (TRECE MARTIRES CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TMC 1 – 37XW
Along Marcius Ave. from Trece Martires City – Indang Road to
and including Capitol Hills Subd. 1 & 2 in Bgy. Lapidario.
REASON: Partial conversion of 13.8kV circuit TMC-1 37XW to 34.5
kV circuit FCIE 42WB.
SUNDAY, MAY 26, 2013
BULACAN
BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – THE
WHOLE OF CIRCUITS ANGAT 32YT AND 36YT; AND PORTION OF CIRCUIT BALIWAG
322YW
Portion of Sulucan St. from near Malamig Road to Don Pablo
Amisola Memorial School including Claro Santos, Cenon Perez,
Francisco Ramos, Leonardo Perez and Victor De Leon Sts., Niugan and
NIA Roads, Gonzales Subd., Legarda Subd. (Purok 5), and Puroks 2 & 3
in Bgys. Bonga Mayor, Bonga Menor, Paltok and Tibagan in Bustos; and
Bgy. Niugan, Angat.
Portion of Sulucan, Fernando and Guzman Sts. from near
Basketball Court in Bgy. Donacion to near Leonardo St. in Bgy. Sta.
Cruz including Bgys. Taboc, Sulucan, Marungko, Sta. Lucia, Laog,
Banaban, Baybay, Binagbag, Donacion, Encanto, Paltok, San Roque, Sto.
Cristo and Sta. Cruz in Angat.
Bgy. Malawak in Bustos.
Bgys. Bayabas, Camachile, Pulong Sampalok and Sapang Bulak in
Doña Remedios Trinidad.
Bgy. Pinagtulayan in Norzagaray.
Bgys. Pulo, Sampaloc, Sapang Pahalang and Tukod in San Rafael.
Bgy. Casalat in San Ildefonso.
Portion of M. Fernando, Payumo and Dr. M. Pascual Sts. from
Meralco – Angat substation in Bgy. Sta. Cruz, Angat to and including
Bgys. Bangkal, Baraka, Bitungol, Matictic, Tigbe and Poblacion in
Norzagaray.
BETWEEN 2:00AM AND 2:30AM AND THEN BETWEEN 6:30AM AND 7:00AM –
PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Gov. Fortunato Halili Ave. from Meralco – Sta. Maria
substation along North Luzon Expressway in Bgy. Turo, Bocaue to near
A. Mabini St. in Bgy. Bagbaguin, Sta. Maria including Bureau of
Internal Revenue (BIR) – Revenue District Office No. 25B, Max's
Restaurant, Landbank - Sta. Maria Branch and Formix Bldg. in Bgy.
Bagbaguin, Sta. Maria.
BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Sta. Maria Bypass Road from Gov. Fortunato Halili
Ave. in Bgy. Bagbaguin to near Bgy. Sta. Clara in Sta. Maria.
REASON: Various line maintenance and construction works along
Sta. Maria Bypass Road in Bgy. Bagbaguin, Sta. Maria,
Bulacan.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
MERALCO Maintenance Schedule for May 20 - 26, 2013 (Grp2) (Sent by: Janice V. De Asis)
=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 20
to 26, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY, MAY 21, 2013
LAGUNA (STA. ROSA)
BETWEEN 12:01AM AND 3:00AM – PORTION OF CIRCUIT BALIBAGO 41XV
Portion of Felix Reyes St. from near South Luzon Expressway
(SLEX) in Bgy. Pulong Sta. Cruz to and including Monde – Nissin,
Meridian Industrial Complex; and J. B. Village 2 in Bgy. Balibago.
Portion of San Lorenzo Road from Felix Reyes St. to and
including Enchanted Kingdom, Waltermart, Total Gas Station; San
Lorenzo South Subd., Terra Fortuna Phase 2 Subd., Villa De Toledo
Subd., Villa Esmeralda Subd. and Villa Segovia Subd in Bgy. Malitlit.
REASON: Line reconstruction works along Felix Reyes St., Bgy.
Balibago, Sta. Rosa, Laguna.
BULACAN (ANGAT; AND NORZAGARAY)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 1:00PM AND 2:00PM – THE
WHOLE OF CIRCUIT ANGAT 32YT
Portion of M. Fernando and A. Payumo Sts. from Meralco – Angat
substation near Encanto Road in Bgy. Sta. Cruz, Angat to and
including Villarama St., Calle Putol, Sitios Bato, Bulalo, Coral,
Gulod, Kanyakan and Palale in Bgys. Bangkal, Bitungol, Matictic,
Poblacion and Tigbe in Norzagaray.
REASON: Preventive maintenance and testing works inside Meralco -
Angat substation.
CAVITE (NAIC; AND TANZA)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 7:00PM AND 8:00PM – THE
WHOLE OF CIRCUIT TANZA 32ZW
Portion of Antero Soriano Highway from Naic – Tanza Municipal
boundary in Bgy. Munting Mapino in Naic to Meralco - Tanza substation
including Calibuyo Elementary School, Halayhay Elementary School;
Villa Juanita Subd., Glowingfield Village, Greenville Homes,
Springfield View Subd.; Bgys. Amaya 1, Calibuyo, Halayhay, Lambingan,
Timalan Lontoc and Sahud Ulan in Tanza.
REASON: Preventive maintenance and testing works inside Meralco –
Tanza substation.
THURSDAY, MAY 23, 2013
BULACAN (NORZAGARAY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT ANGAT 32YT
Portion of Norzagaray Provincial Road from A. Payumo St. to
and including Bgy. Bitungol; T. Gener and Villarama Sts. in Bgy.
Poblacion.
REASON: Line re-conductoring and upgrading works in Bgys.
Bitungol and Poblacion in Norzagaray, Bulacan.
CALOOCAN CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT CAMARIN 433TC
El Paseo Subd., Bankers Village I Subd. and Senate Housing
Project in Bagumbong.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT CAMARIN 433TC
Franville II Subd., North Haven Condominium and Palmera Springs
Phase III in Bagumbong; Congressional Model Subd. and Sampaguita
Subd. in Camarin; and Shelterville I Subd. in Bgy. Bagong Silang.
REASON: Installation of additional lightning protection devices
and line reconductoring works in Palmera Springs Subd.,
Bagumbomg, Caloocan City.
FRIDAY, MAY 24, 2013
BULACAN (HAGONOY)
BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CALUMPIT 325YQ
Purok 1-A, 2, 3, 4, 5 & 7 in Bgy. Mercado; Purok 1, 2, 3, 4 & 5
in Bgy. San Jose; Purok 1-A, 1-B, 3, 4 & 6 in Bgy. Sta. Monica; Purok
3 in Bgy. Sto. Niño.
REASON: Various maintenance and upgrading works in Bgys. Mercado,
San Jose, Sta. Monica nd Sto. Niño in Hagonoy, Bulacan.
CAVITE (TRECE MARTIRES CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TMC 1 – 37XW
Along Marcius Ave. from Trece Martires City – Indang Road to
and including Capitol Hills Subd. 1 & 2 in Bgy. Lapidario.
REASON: Partial conversion of 13.8kV circuit TMC-1 37XW to 34.5
kV circuit FCIE 42WB.
SUNDAY, MAY 26, 2013
BULACAN
BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – THE
WHOLE OF CIRCUITS ANGAT 32YT AND 36YT; AND PORTION OF CIRCUIT BALIWAG
322YW
Portion of Sulucan St. from near Malamig Road to Don Pablo
Amisola Memorial School including Claro Santos, Cenon Perez,
Francisco Ramos, Leonardo Perez and Victor De Leon Sts., Niugan and
NIA Roads, Gonzales Subd., Legarda Subd. (Purok 5), and Puroks 2 & 3
in Bgys. Bonga Mayor, Bonga Menor, Paltok and Tibagan in Bustos; and
Bgy. Niugan, Angat.
Portion of Sulucan, Fernando and Guzman Sts. from near
Basketball Court in Bgy. Donacion to near Leonardo St. in Bgy. Sta.
Cruz including Bgys. Taboc, Sulucan, Marungko, Sta. Lucia, Laog,
Banaban, Baybay, Binagbag, Donacion, Encanto, Paltok, San Roque, Sto.
Cristo and Sta. Cruz in Angat.
Bgy. Malawak in Bustos.
Bgys. Bayabas, Camachile, Pulong Sampalok and Sapang Bulak in
Doña Remedios Trinidad.
Bgy. Pinagtulayan in Norzagaray.
Bgys. Pulo, Sampaloc, Sapang Pahalang and Tukod in San Rafael.
Bgy. Casalat in San Ildefonso.
Portion of M. Fernando, Payumo and Dr. M. Pascual Sts. from
Meralco – Angat substation in Bgy. Sta. Cruz, Angat to and including
Bgys. Bangkal, Baraka, Bitungol, Matictic, Tigbe and Poblacion in
Norzagaray.
BETWEEN 2:00AM AND 2:30AM AND THEN BETWEEN 6:30AM AND 7:00AM –
PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Gov. Fortunato Halili Ave. from Meralco – Sta. Maria
substation along North Luzon Expressway in Bgy. Turo, Bocaue to near
A. Mabini St. in Bgy. Bagbaguin, Sta. Maria including Bureau of
Internal Revenue (BIR) – Revenue District Office No. 25B, Max's
Restaurant, Landbank - Sta. Maria Branch and Formix Bldg. in Bgy.
Bagbaguin, Sta. Maria.
BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Sta. Maria Bypass Road from Gov. Fortunato Halili
Ave. in Bgy. Bagbaguin to near Bgy. Sta. Clara in Sta. Maria.
REASON: Various line maintenance and construction works along
Sta. Maria Bypass Road in Bgy. Bagbaguin, Sta. Maria,
Bulacan.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for May 20
to 26, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY, MAY 21, 2013
LAGUNA (STA. ROSA)
BETWEEN 12:01AM AND 3:00AM – PORTION OF CIRCUIT BALIBAGO 41XV
Portion of Felix Reyes St. from near South Luzon Expressway
(SLEX) in Bgy. Pulong Sta. Cruz to and including Monde – Nissin,
Meridian Industrial Complex; and J. B. Village 2 in Bgy. Balibago.
Portion of San Lorenzo Road from Felix Reyes St. to and
including Enchanted Kingdom, Waltermart, Total Gas Station; San
Lorenzo South Subd., Terra Fortuna Phase 2 Subd., Villa De Toledo
Subd., Villa Esmeralda Subd. and Villa Segovia Subd in Bgy. Malitlit.
REASON: Line reconstruction works along Felix Reyes St., Bgy.
Balibago, Sta. Rosa, Laguna.
BULACAN (ANGAT; AND NORZAGARAY)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 1:00PM AND 2:00PM – THE
WHOLE OF CIRCUIT ANGAT 32YT
Portion of M. Fernando and A. Payumo Sts. from Meralco – Angat
substation near Encanto Road in Bgy. Sta. Cruz, Angat to and
including Villarama St., Calle Putol, Sitios Bato, Bulalo, Coral,
Gulod, Kanyakan and Palale in Bgys. Bangkal, Bitungol, Matictic,
Poblacion and Tigbe in Norzagaray.
REASON: Preventive maintenance and testing works inside Meralco -
Angat substation.
CAVITE (NAIC; AND TANZA)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 7:00PM AND 8:00PM – THE
WHOLE OF CIRCUIT TANZA 32ZW
Portion of Antero Soriano Highway from Naic – Tanza Municipal
boundary in Bgy. Munting Mapino in Naic to Meralco - Tanza substation
including Calibuyo Elementary School, Halayhay Elementary School;
Villa Juanita Subd., Glowingfield Village, Greenville Homes,
Springfield View Subd.; Bgys. Amaya 1, Calibuyo, Halayhay, Lambingan,
Timalan Lontoc and Sahud Ulan in Tanza.
REASON: Preventive maintenance and testing works inside Meralco –
Tanza substation.
THURSDAY, MAY 23, 2013
BULACAN (NORZAGARAY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT ANGAT 32YT
Portion of Norzagaray Provincial Road from A. Payumo St. to
and including Bgy. Bitungol; T. Gener and Villarama Sts. in Bgy.
Poblacion.
REASON: Line re-conductoring and upgrading works in Bgys.
Bitungol and Poblacion in Norzagaray, Bulacan.
CALOOCAN CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT CAMARIN 433TC
El Paseo Subd., Bankers Village I Subd. and Senate Housing
Project in Bagumbong.
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT CAMARIN 433TC
Franville II Subd., North Haven Condominium and Palmera Springs
Phase III in Bagumbong; Congressional Model Subd. and Sampaguita
Subd. in Camarin; and Shelterville I Subd. in Bgy. Bagong Silang.
REASON: Installation of additional lightning protection devices
and line reconductoring works in Palmera Springs Subd.,
Bagumbomg, Caloocan City.
FRIDAY, MAY 24, 2013
BULACAN (HAGONOY)
BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CALUMPIT 325YQ
Purok 1-A, 2, 3, 4, 5 & 7 in Bgy. Mercado; Purok 1, 2, 3, 4 & 5
in Bgy. San Jose; Purok 1-A, 1-B, 3, 4 & 6 in Bgy. Sta. Monica; Purok
3 in Bgy. Sto. Niño.
REASON: Various maintenance and upgrading works in Bgys. Mercado,
San Jose, Sta. Monica nd Sto. Niño in Hagonoy, Bulacan.
CAVITE (TRECE MARTIRES CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TMC 1 – 37XW
Along Marcius Ave. from Trece Martires City – Indang Road to
and including Capitol Hills Subd. 1 & 2 in Bgy. Lapidario.
REASON: Partial conversion of 13.8kV circuit TMC-1 37XW to 34.5
kV circuit FCIE 42WB.
SUNDAY, MAY 26, 2013
BULACAN
BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – THE
WHOLE OF CIRCUITS ANGAT 32YT AND 36YT; AND PORTION OF CIRCUIT BALIWAG
322YW
Portion of Sulucan St. from near Malamig Road to Don Pablo
Amisola Memorial School including Claro Santos, Cenon Perez,
Francisco Ramos, Leonardo Perez and Victor De Leon Sts., Niugan and
NIA Roads, Gonzales Subd., Legarda Subd. (Purok 5), and Puroks 2 & 3
in Bgys. Bonga Mayor, Bonga Menor, Paltok and Tibagan in Bustos; and
Bgy. Niugan, Angat.
Portion of Sulucan, Fernando and Guzman Sts. from near
Basketball Court in Bgy. Donacion to near Leonardo St. in Bgy. Sta.
Cruz including Bgys. Taboc, Sulucan, Marungko, Sta. Lucia, Laog,
Banaban, Baybay, Binagbag, Donacion, Encanto, Paltok, San Roque, Sto.
Cristo and Sta. Cruz in Angat.
Bgy. Malawak in Bustos.
Bgys. Bayabas, Camachile, Pulong Sampalok and Sapang Bulak in
Doña Remedios Trinidad.
Bgy. Pinagtulayan in Norzagaray.
Bgys. Pulo, Sampaloc, Sapang Pahalang and Tukod in San Rafael.
Bgy. Casalat in San Ildefonso.
Portion of M. Fernando, Payumo and Dr. M. Pascual Sts. from
Meralco – Angat substation in Bgy. Sta. Cruz, Angat to and including
Bgys. Bangkal, Baraka, Bitungol, Matictic, Tigbe and Poblacion in
Norzagaray.
BETWEEN 2:00AM AND 2:30AM AND THEN BETWEEN 6:30AM AND 7:00AM –
PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Gov. Fortunato Halili Ave. from Meralco – Sta. Maria
substation along North Luzon Expressway in Bgy. Turo, Bocaue to near
A. Mabini St. in Bgy. Bagbaguin, Sta. Maria including Bureau of
Internal Revenue (BIR) – Revenue District Office No. 25B, Max's
Restaurant, Landbank - Sta. Maria Branch and Formix Bldg. in Bgy.
Bagbaguin, Sta. Maria.
BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Sta. Maria Bypass Road from Gov. Fortunato Halili
Ave. in Bgy. Bagbaguin to near Bgy. Sta. Clara in Sta. Maria.
REASON: Various line maintenance and construction works along
Sta. Maria Bypass Road in Bgy. Bagbaguin, Sta. Maria,
Bulacan.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
Thursday, May 9, 2013
MERALCO Maintenance Schedule (Grp2) (Sent by: Janice V. De Asis)
=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
In view of the upcoming 2013 Mid-term Elections, please be advised that we
will not schedule any power interruptions for period May 6 to 20, 2013.
Rest assured that we will continue sending you our Meralco Maintenance
Schedule once moratorium is lifted.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
In view of the upcoming 2013 Mid-term Elections, please be advised that we
will not schedule any power interruptions for period May 6 to 20, 2013.
Rest assured that we will continue sending you our Meralco Maintenance
Schedule once moratorium is lifted.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.
Subscribe to:
Comments (Atom)