Friday, May 17, 2013

MERALCO Maintenance Schedule for May 20 - 26, 2013 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for May 20
to 26, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


TUESDAY, MAY 21, 2013
LAGUNA (STA. ROSA)
BETWEEN 12:01AM AND 3:00AM – PORTION OF CIRCUIT BALIBAGO 41XV
Portion of Felix Reyes St. from near South Luzon Expressway
(SLEX) in Bgy. Pulong Sta. Cruz to and including Monde – Nissin,
Meridian Industrial Complex; and J. B. Village 2 in Bgy. Balibago.
Portion of San Lorenzo Road from Felix Reyes St. to and
including Enchanted Kingdom, Waltermart, Total Gas Station; San
Lorenzo South Subd., Terra Fortuna Phase 2 Subd., Villa De Toledo
Subd., Villa Esmeralda Subd. and Villa Segovia Subd in Bgy. Malitlit.

REASON: Line reconstruction works along Felix Reyes St., Bgy.
Balibago, Sta. Rosa, Laguna.

BULACAN (ANGAT; AND NORZAGARAY)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 1:00PM AND 2:00PM – THE
WHOLE OF CIRCUIT ANGAT 32YT
Portion of M. Fernando and A. Payumo Sts. from Meralco – Angat
substation near Encanto Road in Bgy. Sta. Cruz, Angat to and
including Villarama St., Calle Putol, Sitios Bato, Bulalo, Coral,
Gulod, Kanyakan and Palale in Bgys. Bangkal, Bitungol, Matictic,
Poblacion and Tigbe in Norzagaray.

REASON: Preventive maintenance and testing works inside Meralco -
Angat substation.

CAVITE (NAIC; AND TANZA)

BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 7:00PM AND 8:00PM – THE
WHOLE OF CIRCUIT TANZA 32ZW
Portion of Antero Soriano Highway from Naic – Tanza Municipal
boundary in Bgy. Munting Mapino in Naic to Meralco - Tanza substation
including Calibuyo Elementary School, Halayhay Elementary School;
Villa Juanita Subd., Glowingfield Village, Greenville Homes,
Springfield View Subd.; Bgys. Amaya 1, Calibuyo, Halayhay, Lambingan,
Timalan Lontoc and Sahud Ulan in Tanza.


REASON: Preventive maintenance and testing works inside Meralco –
Tanza substation.

THURSDAY, MAY 23, 2013
BULACAN (NORZAGARAY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT ANGAT 32YT
Portion of Norzagaray Provincial Road from A. Payumo St. to
and including Bgy. Bitungol; T. Gener and Villarama Sts. in Bgy.
Poblacion.

REASON: Line re-conductoring and upgrading works in Bgys.
Bitungol and Poblacion in Norzagaray, Bulacan.

CALOOCAN CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 2:30PM AND 3:00PM –
PORTION OF CIRCUIT CAMARIN 433TC
El Paseo Subd., Bankers Village I Subd. and Senate Housing
Project in Bagumbong.

BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT CAMARIN 433TC
Franville II Subd., North Haven Condominium and Palmera Springs
Phase III in Bagumbong; Congressional Model Subd. and Sampaguita
Subd. in Camarin; and Shelterville I Subd. in Bgy. Bagong Silang.

REASON: Installation of additional lightning protection devices
and line reconductoring works in Palmera Springs Subd.,
Bagumbomg, Caloocan City.

FRIDAY, MAY 24, 2013
BULACAN (HAGONOY)
BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CALUMPIT 325YQ
Purok 1-A, 2, 3, 4, 5 & 7 in Bgy. Mercado; Purok 1, 2, 3, 4 & 5
in Bgy. San Jose; Purok 1-A, 1-B, 3, 4 & 6 in Bgy. Sta. Monica; Purok
3 in Bgy. Sto. Niño.

REASON: Various maintenance and upgrading works in Bgys. Mercado,
San Jose, Sta. Monica nd Sto. Niño in Hagonoy, Bulacan.

CAVITE (TRECE MARTIRES CITY)
BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TMC 1 – 37XW
Along Marcius Ave. from Trece Martires City – Indang Road to
and including Capitol Hills Subd. 1 & 2 in Bgy. Lapidario.

REASON: Partial conversion of 13.8kV circuit TMC-1 37XW to 34.5
kV circuit FCIE 42WB.

SUNDAY, MAY 26, 2013
BULACAN
BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – THE
WHOLE OF CIRCUITS ANGAT 32YT AND 36YT; AND PORTION OF CIRCUIT BALIWAG
322YW
Portion of Sulucan St. from near Malamig Road to Don Pablo
Amisola Memorial School including Claro Santos, Cenon Perez,
Francisco Ramos, Leonardo Perez and Victor De Leon Sts., Niugan and
NIA Roads, Gonzales Subd., Legarda Subd. (Purok 5), and Puroks 2 & 3
in Bgys. Bonga Mayor, Bonga Menor, Paltok and Tibagan in Bustos; and
Bgy. Niugan, Angat.
Portion of Sulucan, Fernando and Guzman Sts. from near
Basketball Court in Bgy. Donacion to near Leonardo St. in Bgy. Sta.
Cruz including Bgys. Taboc, Sulucan, Marungko, Sta. Lucia, Laog,
Banaban, Baybay, Binagbag, Donacion, Encanto, Paltok, San Roque, Sto.
Cristo and Sta. Cruz in Angat.
Bgy. Malawak in Bustos.
Bgys. Bayabas, Camachile, Pulong Sampalok and Sapang Bulak in
Doña Remedios Trinidad.
Bgy. Pinagtulayan in Norzagaray.
Bgys. Pulo, Sampaloc, Sapang Pahalang and Tukod in San Rafael.
Bgy. Casalat in San Ildefonso.
Portion of M. Fernando, Payumo and Dr. M. Pascual Sts. from
Meralco – Angat substation in Bgy. Sta. Cruz, Angat to and including
Bgys. Bangkal, Baraka, Bitungol, Matictic, Tigbe and Poblacion in
Norzagaray.

BETWEEN 2:00AM AND 2:30AM AND THEN BETWEEN 6:30AM AND 7:00AM –
PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Gov. Fortunato Halili Ave. from Meralco – Sta. Maria
substation along North Luzon Expressway in Bgy. Turo, Bocaue to near
A. Mabini St. in Bgy. Bagbaguin, Sta. Maria including Bureau of
Internal Revenue (BIR) – Revenue District Office No. 25B, Max's
Restaurant, Landbank - Sta. Maria Branch and Formix Bldg. in Bgy.
Bagbaguin, Sta. Maria.

BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUIT STA. MARIA 425YU
Portion of Sta. Maria Bypass Road from Gov. Fortunato Halili
Ave. in Bgy. Bagbaguin to near Bgy. Sta. Clara in Sta. Maria.

REASON: Various line maintenance and construction works along
Sta. Maria Bypass Road in Bgy. Bagbaguin, Sta. Maria,
Bulacan.




MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph



Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.