MERALCO Maintenance Schedule for July 8 - 14, 2013 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for July 8
to 14, 2013. This serves as a general information guide and should not be
directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


SATURDAY, JULY 6, 2013
**PARAÑAQUE CITY
BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 1:30PM AND 2:00PM –
PORTION OF CIRCUIT PARAÑAQUE 18ZJ
Portion of Quirino Ave. and Tramo St. from Meralco – Parañaque
substation along Bayside Court St. to Moonshell St. including
Kabihasnan, A. Bonifacio and McDonough Sts.; Saulog Transit, CPI
Machine Shop and Mormon Church in Bgys. Sto. Dionisio and Tambo.

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT PARAÑAQUE 18ZJ
Portion of J.P. Rizal St. from Quirino Ave. to Col. E. De Leon
St. including 2nd, 3rd, Dahlia, Gomburza, Rizal and Sampaguita Sts.
in Bgy. Sto. Niño.

REASON: Line reconstruction works along Dr. J.P. Rizal St. in
Bgy. Sto. Niño, Parañaque City.

SUNDAY, JULY 7, 2013
*BATANGAS (STO. TOMAS)
BETWEEN 10:00AM AND 12:00NN – THE WHOLE OF CIRCUIT MAKBAN 56MB
St. Thomas Paper in Bgy. San Felix.

REASON: NGCP maintenance works inside NGCP – Makban substation.

TUESDAY, JULY 9, 2013
*QUEZON PROVINCE (PAGBILAO)
BETWEEN 8:00AM AND 6:00PM – PORTION OF CIRCUIT TAYABAS 51ZY
Portion of Maharlika Highway from near Barangay Ilayang
Palsabangon Daycare Center to and including Sitio Amao, Sitio Anos,
Sitio Crossing, Sitio Daungang Pari, Sitio Iringan, Bgys. Ibabang
Palsabangon, Ilayang Palsabangon, Binahaan, Kanlurang Malicboy,
Silangan Malicboy.

REASON: NGCP maintenance works along NGCP Kalayaan – Gumaca 230kv
transmission lines.

TUESDAY TO WEDNESDAY, JULY 9 – 10, 2013
PARAÑAQUE CITY (DON BOSCO)
BETWEEN 11:00PM AND 11:30PM (TUE., 07/09/13) AND THEN BETWEEN 3:30AM
AND 4:00AM (WED., 07/10/13) – PORTION OF CIRCUIT BF - PARAÑAQUE 45WU
Portion of St. Simon and Michael Rua Sts. from St. Louis St. to
Don Bosco St. including Don Bosco Center of Studies and Don Bosco
Seminary in Better Living Subd.

BETWEEN 11:00PM (TUE., 07/09/13) AND 4:00AM (WED., 07/10/13) –
PORTION OF CIRCUIT BF - PARAÑAQUE 45WU
Portion of Don Bosco St. from Michael Rua St. to near India St.
including Ireland and Indonesia Sts. in Better Living Subd.
Portion of France and Lebanon Sts. from India St. to and
including Iraq, Indonesia, Malaysia, Morocco, New Zealand and
Nicaragua Sts. in Better Living Subd.

REASON: Line reconstruction works along Michael Rua corner Iran
Sts. in Better Living Subd., Bgy. Don Bosco, Parañaque
City.

SATURDAY, JULY 13, 2013
LAGUNA (SAN PABLO CITY)
BETWEEN 7:00AM AND 7:30AM AND THEN BETWEEN 11:30AM AND 12:00NN –
PORTION OF CIRCUIT SAN PABLO II 45WJ
Portion of PNR Rail Road Track from San Francisco Subd. in Bgy.
San Francisco to Purok 3 in Bgy. San Gregorio including DS
Cosmeceutical Mfg. Lab., LRP Farm and SRA Feliza Farm in Bgys.
Soledad and Sta. Maria.

BETWEEN 7:00AM AND 12:00NN – PORTION OF CIRCUIT SAN PABLO II 45WJ
Portion of PNR Rail Road Track from Purok 3 in Bgy. San
Gregorio to and including Bgy. Sta. Ana, 3J Ice Mfg., Escaba Food
Products and Stalder Laboratories; Bgys. Atisan, San Ignacio, San
Isidro, San Joaquin and Santisimo Rosario.

REASON: Replacement of rotten pole along PNR Rail Road Track at
Bgy. San Gregorio, San Pablo City, Laguna.

SUNDAY TO MONDAY, JULY 14 – 15, 2013
BULACAN (GUIGUINTO; MALOLOS CITY; AND PLARIDEL)
BETWEEN 1:00AM AND 2:00AM (SUN., 07/14/13) AND THEN BETWEEN 7:00AM
AND 8:00AM (MON., 07/15/13) – THE WHOLE OF CIRCUIT MALOLOS 34YV; AND
PORTION OF CIRCUIT MALOLOS 325YV
Portion of Rueda – Dampol Barangay Road from Bgy. Rueda to P.
Reyes St. including Bgys. Rueda, Lagundi, Dampol, Sipat and Lumang
Bayan in Plaridel.
Portion of Gov. Padilla Ave. from Lugam Road to Tabang St. in
Plaridel including Gov. Santiago St., Plaridel Airport Road, Doña
Crispina Subd., Sta Monica Park Subd., Mary Grace Village in Bgy.
Barihan and Santisima Trinidad in Malolos City; Bgys. Agnaya, Sto.
Niño and Poblacion in Plaridel.
Portion of Tabang St. from Gov. Padilla Ave. to Cagayan Valley
Road including Sta. Isabel Village in Bgys. Sta. Ines and Tabang in
Plaridel.
Portion of Cagayan Valley Road from Rocka Village to and
including Bgys. Bungahan and Ligas in Malolos City; Bgy. Sta. Rita in
Guiguinto.

REASON: Repair and maintenance works inside Meralco – Malolos
substation.




MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph




*Additional PPI
**Revised PPI (rescheduled from last week)
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.