Friday, September 20, 2013

MERALCO Maintenance Schedule for September 23 - 29, 2013 (Grp2) (Sent by: Janice V. De Asis) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for
September 23 to 29, 2013. This serves as a general information guide and
should not be directly construed as an interruption advisory to the e-mail
recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:


MONDAY TO TUESDAY, SEPTEMBER 23 – 24, 2013
QUEZON CITY (PROJECT 2 AND 3)
BETWEEN 11:30PM (MON., 09/23/13) AND 4:30AM (TUE., 09/24/13) –
PORTION OF CIRCUIT CUBAO 42VQ
Portion of Aurora Blvd. from Nico Gas Center to Anonas St.
including McDonald's in Bgy. Quirino 3-A.
Portion of Anonas St. from Aurora Blvd. to K-6th St. including
K-8th, K-10th, Aguho, Bignay, Chico, Durian, Guyabano, Kubili,
Langka, Lanzones, Molave, Marang, Naranghita, Paho, Rimas and
Siniguelas Sts.; Quirino Elementary School, J & F Bldg., St. Joseph
School and Quirino Police Station in Bgys. East Kamias, West Kamias,
Duyan – Duyan, Quirino 2-A, Quirino 2-B, Quirino 2-C, Quirino 3-A and
Quirino 3-B.

REASON: Replacement of pole and line reconstruction works along
Aurora Blvd. corner Anonas St. in Bgy. Quirino 3-A,
Quezon City.

TUESDAY, SEPTEMBER 24, 2013
MANILA (QUIAPO; SAMPALOC; AND SAN MIGUEL)
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM –
PORTION OF CIRCUIT TEGEN 513B
Portion of Legarda St. from Arlegui St. to C. M. Recto Ave.
including Bilibid Viejo, Cruzada, Concepcion M. Aguila and San Rafael
Sts.; Victorino Mapa High School, DSWD NCR Field Office, Church of
Christ Cruzada, and Samson Institute of Technology in Quiapo and San
Miguel.
Portion of C.M. Recto Ave. from Legarda St. to Quezon Blvd.
including Bilibid Viejo, Carpena, Coromina, Gonzalo Puyat, Matapang,
Progreso, Severino, S. H. Loyola and Nicanor Reyes Sts.; Ever Gotesco
Manila Plaza, University of the East Main Campus, Apolinario Mabini
Elementary School, Philippine College of Health Sciences, San
Sebastian College – Recoletos, Informatics College Manila Campus,
Jollibee – Recto, BDO – C.M. Recto, Corona Bookstore, Cartimar
Shopping Center, Finest Legacy Suites Dormitory, Sogo Hotel – Recto,
Jaca Billards and Café, University Center Bldg., Mang Inasal
Restaurant, Metrobank, Montessori Professional College, Yellow Cab
Restaurant, PNB Recto, KFC Restaurant and National Bookstore in
Quiapo and Sampaloc.
Centro Escolar University – Technology Center & FGH Bldg.,
Jollibee and Chowking Restaurants along Mendiola St. in San Miguel.

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUITS TEGEN 513B; AND
SAMPALOC 13K
Portion of Mendiola St. from Legarda St. to Jose P. Laurel St.
including 1st, 2nd, 4th, Adela, Concepcion M. Aguila, Matienza,
Minerva and Uli – Uli Sts.; Mendiola Police Community Precinct,
Office of the Deputy Ombudsman for the Military, JNL Dormtel,
Kimimori Inc., St. Jude Catholic School, Arellano University –
Plaridel & Cayco Bdlg., Centro Escolar University – Main Campus &
Librada Avelino Hall, San Beda Home for Old Monks, College of the
Holy Spirit, Sun Suites University Residences Dormitory, McDonald's –
Mendiola, KFC – San Beda, and San Beda College – St. Maur's Hall, St.
Beda's Hall and College of Nursing in San Miguel.

REASON: Replacement of rotten pole and trimming of overhanging
tree branches along Mendiola St. in San Miguel, Manila.

WEDNESDAY, SEPTEMBER 25, 2013
MAKATI CITY; MANDALUYONG CITY; AND MANILA
BETWEEN 12:01AM and 12:30AM AND THEN BETWEEN 4:00AM AND 4:30AM –
PORTIONS OF CIRCUIT NEW ROCKWELL 436VV
Portion of Chino Roces Ave. (Pasong Tamo), A. P. Reyes Ave. and
P. Domingo St. from Barasoain St. in Bgy. Olympia, Makati City to and
including Sta. Clara, Isabel and Lamayan Sts. in Sta. Ana, Manila; H.
Santos, Malolos, Novaliches, Adora, D. Gomez, Evangelista and Sandico
Sts.; BJS Cpd.; McDonald's and Jollibee Restaurants in Bgys. Carmona,
Kasilawan, Olympia and Tejeros in Makati City.
Portion of J. P. Rizal St. from Claro Castañeda St. to and
including I. J. Cruz and G. Enriquez Sts.; Mandaluyong Executive
Mansions, Isaac Lopez Elementary School, Phil. Electrical Mfg. Co.
(PEMCO), Mang Inasal Restaurant and Discovery Industrial Dev. in Bgy.
Vergara, Mandaluyong City.
Portion of Rev. G. Aglipay from L. Parada St. to Boni Ave.
including C. De Venecia and N. Leyba Sts.; Dreamland Townhomes;
Quanta Paper Marketing, Nice Products and Universal Motors in Bgys.
Old Saniga and Namayan in Mandaluyong City.

BETWEEN 12:01AM AND 4:30AM – PORTION OF CIRCUITS NEW ROCKWELL 436VV;
AND PANDACAN 12M
Portion of J. P. Rizal St. from A. Mabini St. to and including
Claro Castañeda St.; Abelo Cpd., Acropolis Subd. and Wonderland
Homes; Doña Basilica Yangco Elementary School, Filpride Trucking,
Namayan Realty, Sea Oil Gas Station and Golden Dragon Metal in Bgys.
Mabini – J. Rizal and Namayan in Mandaluyong City.

REASON: Replacement of rotten cross-arms, re-construction of
facilities and other line rehabilitation activities along
J. P. Rizal St. near Wonderland St. in Bgy. Namayan,
Mandaluyong City.

THURSDAY, SEPTEMBER 26, 2013
MANILA (TONDO)
BETWEEN 12:01AM AND 5:00AM – THE WHOLE OF CIRCUIT TUTUBAN 45VT
Tutuban Shopping Center Mall 1 and 2.

REASON: Various maintenance works inside Meralco – Tutuban
substation.

BULACAN (BALAGTAS; AND BOCAUE)
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM –
PORTIONS OF CIRCUIT STA. MARIA 424YU
Portion of of MacArthur Highway from Golden City Business Park
in Bgy. Wakas, Bocaue to and including A. Jose, San Juan and NIA
Sts.; and Magdalena Subd. in Bgy. San Juan, Balagtas; Intercity
Industrial Estate Subd. and Urezza Subd. in Bgy. Wakas, Bocaue.
Portion of MacArthur Highway from F. Santos St. to near Petron
Gas Station including P. Castro, F. Sison, Longos, San Gabriel and L.
Galvez Sts.; Mariano Village and T. Chan Subd. in Bgys. Borol 1st,
Longos and Wawa in Balagtas.

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT STA. MARIA 424YU
Balagtas Municipal Hall along MacArthur Highway in Bgy. Wawa,
Balagtas.

REASON: Relocation of wood poles affected by DPWH road widening
project along Balagtas bridge in Balagtas, Bulacan.

CAVITE (TAGAYTAY CITY)
BETWEEN 9:00AM AND 4:00PM – PORTION OF CIRCUITS TAGAYTAY WEST 312TGW
AND 313TGW
Portion of Tagaytay – Nasugbu National Highway from Meralco –
Tagaytay West substation near Robinsons Summit Ridge to near Hinode
Japanese Restaurant including Lake View Subd., Taal Vista Hotel and
Petron Gas Station in Bgys. Kaybagal South, Maharlika East and City
proper.

REASON: Replacement of badly leaning poles along Tagaytay –
Nasugbu National Highway in Bgy. Maharlika East, Tagaytay
City, Cavite.

FRIDAY TO SATURDAY, SEPTEMBER 27 - 28, 2013
BULACAN (PULILAN)
BETWEEN 11:00PM AND 11:30PM (FRI., 09/27/13) AND THEN BETWEEN 7:30AM
AND 8:00AM (SAT., 09/28/13) – PORTION OF CIRCUIT MALOLOS 62YV –
BALIWAG 64YW
Nestle – Pulilan in Bgy. Tibag and Malakas Steel in Bgy.
Dampol.

REASON: Maintenance works inside Meralco - Malolos substation;
and sub-transmission line works along Malolos 62YV –
Baliwag 64YW 69kV line in Malolos and Plaridel, Bulacan.

SUNDAY, SEPTEMBER 29, 2013
BULACAN (BALIUAG)
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM –
PORTION OF CIRCUIT BALIWAG 314YW
Portion of J. P. Rizal St. from near St. Tagle St. to and
including Little Angels Christian Academy, Marian College, Baliuag
University, Philippine National Bank; Gil Carlos, A. Luna, J. M.
Basa, J. Buizon, P. Angels, Cunanan, La Rosa Santiago, Tumana and
Lopez Jaena Sts. in Bgys. Poblacion, Concepcion, San Jose, Sta.
Barbara and Sto. Cristo.

BETWEEN 12:01AM AND 5:00AM – THE WHOLE OF CIRCUIT BALIWAG 324YW; AND
PORTION OF CIRCUIT BALIWAG 314YW
Portion of Doña Remedios Trinidad Highway from Meralco –
Baliwag substation to and including SM Baliuag and Jollibee in Bgys.
Bagong Bayan and Pagala.

REASON: Relocation of facilities due to DPWH road widening and
rehabilitation of Tangos bridges along Doña Remedios
Trinidad Highway, Baliuag, Bulacan.

CAVITE (DASMARIÑAS CITY)
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT DASMARIÑAS 43DA
Portion of Governor Drive from Paredes Bridge to and including
Manila Memorial Park – Dasmariñas City, Philflex Compound, Carmel
Heights Royale Subd., Greenbreeze Village IV, La Mediterranea Subd.
and St. Charbel Property in Bgys. Sampaloc I to IV.

REASON: Line works along Governor Drive in Bgy. Sampaloc I,
Dasmariñas City, Cavite.

SUNDAY AND MONDAY, SEPTEMBER 29 AND 30, 2013
LAGUNA (CABUYAO)
BETWEEN 5:30PM AND 5:35PM (SUN., 09/29/13) AND THEN BETWEEN 6:55AM
AND 7:00AM (MON., 09/30/13) – PORTION OF CIRCUIT BALIBAGO 65XV –
CANLUBANG 62XE
Asia Brewery in Bgy. Sala.

REASON: Installation of new transmission pole along Sta. Rosa –
Cabuyao National Highway in Cabuyao, Laguna.





MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no.
16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph



Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.