WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for April
30 to May 6, 2012. This serves as a general information guide and should
not be directly construed as an interruption advisory to the e-mail
recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".
Thank you very much.
MAINTENANCE SCHEDULE
To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:
TUESDAY, MAY 1, 2012
MAKATI CITY
BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT NEW ROCKWELL 422VV
Portion of Sta. Rita St. and Ramon Magsaysay Ave. from Jacinta
2 Bldg. to and including Guadalupe Commercial Complex, MMDA Bldg.,
Parc House 2, Sogo Hotel - Guadalupe, Chowking Restaurant, Vista
Apartelle, Greenwich Restaurant, Midland Market, MWSS Makati Booster
Pumping Plant & Reservoir, Bgy. Guadalupe Nuevo Hall, Carson Bldg.,
Guadalupe Nuevo Sports Complex, Guadalupe Police Station, Bgy.
Guadalupe Nuevo Health Center, Princess Apartelle and Erico
Apartelle; Orense, Nuestra Del Carmen, Antipolo, La Consolacion,
Mangahan, Sgt. Fabian Yabut Circle, P. Burgos, P. Victor, Retiro,
Felipe, Sampaguita, Mactan, Balagtas and Dapitan Sts. in Bgy.
Guadalupe Nuevo.
REASON: Replacement of rotten poles and other line rehabilitation
works along Orense and Magsaysay Sts. in Bgy. Guadalupe
Nuevo, Makati City.
TUESDAY TO WEDNESDAY, MAY 1 – 2, 2012
MANILA (MALATE)
BETWEEN 11:30PM (TUE., 05/01/12) AND 5:30AM (WED., 05/02/12) –
PORTION OF CIRCUIT PACO 414VY – MALATE 43J
Portion of Leon Guinto Sr. St. from Dagonoy St. to Estrada St.
including Tiongco Apartment.
REASON: Replacement of rotten pole and line reconstruction works
along Leon Guinto Sr. St. near Estrada St. in Malate,
Manila.
WEDNESDAY, MAY 2, 2012
QUEZON PROVINCE (LUCENA CITY AND TAYABAS)
BETWEEN 12:01AM AND 4:00AM – PORTION OF CIRCUITS TAYABAS 44ZY AND
51ZY
Portion of D. Nadres and Luis Palad Sts. from Meralco – Tayabas
substation in Bgy. Mateuna, Tayabas.
Portion of Tayabas – Lucena Road and Quezon Ave. from Tayabas
Public Market to Hermana Fausta St. in Lucena City including Lita
Subd., Lovely Subd., Carmenville Subd., St. John Bosco Academy, New
Tayabas Oil Mill and La Tondeña Distillers in Bgys. Matuena, Wakas,
Ipilan, Domoit Kanluran, Mayowe, Lita and Tongko in Tayabas.
Portion of Maharlika Highway from Tayabas – Sariaya Provincial
Road to and including M. S. Enverga University Compound, University
Village, PNB Homes, Andaman Village, Capistrano Subd., De Mesa
Compound, Hermana Capistrano Subd. II, Pilar Compound, Reymar
Compound, Happy Family Subd., Ridgewood Park Subd., San Isidro Subd.,
St. Michael Subd., Villa Aurea, Good Luck Subd., St. Peter Subd.,
Calmar Homes and Grand Central in Bgys. Bocohan, Domoit, Gulang
Gulang, Ibabang Dupay and Ilayang Dupay in Lucena City.
Portion of De Leon, Merchan and Enriquez Sts. from Quezon Ave.
to and including House of Halina, Landbank and Sacred Heart College
in Lucena City proper.
REASON: Relocation of facilities along Tayabas – Lucena
Provincial Road in Bgy. Mateuna, Tayabas, Quezon
Province.
FRIDAY TO SATURDAY, MAY 4 - 5, 2012
LAS PIÑAS CITY; AND CAVITE (BACOOR)
BETWEEN 11:00PM AND 11:30PM (FRI., 05/04/12) AND THEN BETWEEN 3:30AM
AND 4:00AM (SAT., 05/05/12) – PORTIONS OF CIRCUIT LAS PIÑAS 45XA
Portion of Alabang – Zapote Road from Tuazon Subd. to Quirino
Ave. (Real) including Pamplona Village, Philips Park Subd., San
Isidro Subd., St. Joseph Subd., Bermuda Country Subd. and Casimiro
Townhomes I in Bgys. Zapote and Pamplona I in Las Piñas City.
Portion of Fruto Santos Ave. (Tramo Road) from Alabang – Zapote
Road to Santos Village including Ecotrend Villas Phases 1 & 2, Kulasi
Compound and Ugma Sarao Compound in Bgy. Zapote, Las Piñas City.
Portion of Quirino Ave. (Real) from near Maricielo Villa to
Bernabe Compound including Perpetual Village, T.S. Sarino Village;
Zapote Builders Center, Las Piñas District Hospital, Talampas Rubber
Milling, Reymark Marketing, Bernardo College and Sir Dinks Food
Products in Bgy. Pulanglupa I, Las Piñas City.
BETWEEN 11:00PM (FRI., 05/04/12) AND 4:00AM (SAT., 05/05/12) –
PORTION OF CIRCUIT LAS PIÑAS 45XA
Portion of Quirino Ave. (Real) from near Alabang – Zapote Road
to Las Piñas – Talaba Diversion Road including Shell Gas Station and
Petron Gas Station in Bgys. Zapote and Pulanglupa I in Las Piñas
City.
Portion of Las Piñas – Talaba Diversion Road from Quirino Ave.
(Real) in Las Piñas City to Alabang – Zapote Road in Bacoor, Cavite
including Ocean Aquamarine Enterprises in Bgy. Zapote III, Bacoor,
Cavite.
Portion of Alabang – Zapote Road from Las Piñas – Talaba
Diversion Road to Manila – Cavite Expressway including Luxor Printing
in Bgy. Longos, Bacoor, Cavite.
Portion of Manila – Cavite Expressway from Las Piñas – Talaba
Diversion Road to near Victory Harvest in Bgys. Talaba II and Longos
in Bacoor, Cavite.
REASON: Relocation of facilities (pole, transformer and wires)
along Quirino Ave. (Real) in Bgy. Pulanglupa I, Las Piñas
City.
SATURDAY TO SUNDAY, MAY 5 - 6, 2012
PASIG CITY
BETWEEN 11:00PM (SAT., 05/05/12) AND 4:00AM (SUN., 05/06/12) –
PORTION OF CIRCUIT SANTOLAN 413RE
Portion of Marcos Highway from V. A. Cristi Cpd. to A.
Rodriguez Ave. including Bali Oasis, Doña Aurora Executive Village
and Agapito Subd. 4; Deeco Electronics, Trans - Asia Textile, Sogo
Hotel, Woodstock Inn and Mariposa Lodge III in Bgy. Santolan.
Portion of A. Rodriguez Ave. from Marcos Highway to and
including Velfox Mfg. Corp.; and Doña Betang Subd. in Bgys. Santolan
and Dela Paz.
REASON: Relocation of facilities affected by DPWH road widening
project along Marcos Highway in Bgy. Santolan, Pasig
City.
SUNDAY, MAY 6, 2012
BATANGAS (BATANGAS CITY)
BETWEEN 6:00AM AND 6:00PM – THE WHOLE OF CIRCUITS NGCP – BOLBOK 32ZZ
AND 33ZZ; AND MAHABANG PARANG 32WZ
Sitio Santa Rita Ilaya in Bgys. Santa Rita Karsada and Soro
Soro Karsada.
Portion of Batangas City – San Jose National Road from Meralco
– Mahabang Parang substation to and including Sitios Kanluran, Ilaya
and Ibaba, Bgys. Bucal, Concepcion and Mahabang Parang.
REASON: NGCP maintenance works inside NGCP – Batangas substation.
LAGUNA (STA. CRUZ, PILA, LILIW AND NAGCARLAN)
BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 2:00PM AND 3:00PM – THE
WHOLE OF CIRCUITS STA. CRUZ 322WF, 32WF, 34WF AND 35WF
The whole of Sta. Cruz.
The whole of Pila excluding Carmen Agra Subd. and Purok Codera
in Bgys. San Antonio and Bulilan Sur.
Bgys. Daniw and Dita in Liliw.
Portion of Bgys. Banca-banca, Manaol, Maravilla, Sibulan and
Wakat in Nagcarlan.
REASON: Maintenance works inside Meralco – Sta. Cruz substation
and replacement of rotten poles in Bgy. Maytalang 2, Sta.
Cruz, Laguna.
MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone
nos. 16211 / 631-1111, fax nos. 1622-8554 / 1622-8556, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".
VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.