Friday, September 14, 2012

MERALCO Maintenance Schedule for September 17 - 23, 2012 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for
September 17 to 23, 2012. This serves as a general information guide and
should not be directly construed as an interruption advisory to the e-mail
recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of
power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word
"Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various
MERALCO distribution facilities, electric service will be temporarily
interrupted on the following dates and places:

SUNDAY, SEPTEMBER 16, 2012
*MANILA
BETWEEN 7:30AM and 7:45AM AND THEN BETWEEN 1:15PM AND 1:30PM –
PORTION OF CIRCUIT PANDACAN 13M; AND THE WHOLE OF CIRCUIT STA. ANA
14VN
Portion of Jesus, Palumpong, Beata and Lorenzo De La Paz Sts.
from Pres. Quirino Ave. to Jesus Ext. including Talundon, Pandacan,
Labores, Zamora, Jesus Alley, Sto. Niño and P. Noble Sts.; Carlos P.
Garcia High School, El Niño Fabricators and Builders, Caritas and
Pandacan Transport in Pandacan.

Portion of Dr. M. L. Carreon and Menandro Sts. from Pedro Gil
St. to Kahilum St. in Pandacan; Portion of Pres. Quirino Ave. from
Zamora St. to Kahilum II St. including Obisis, Carlos, Gonzales,
Jacinto and Sampaguita Sts. in Pandacan.



BETWEEN 8:00AM and 8:15AM AND THEN BETWEEN 1:00PM AND 1:15PM – THE
WHOLE OF CIRCUIT STA. ANA 13VN
Portion of Pedro Gil (Herran) and Old Panaderos Sts. from
Meralco – Sta. Ana substation to Lambingan Bridge including
Emabarcadero, J. Posadas, Road 1, 2, 3, 4, 5, 6 & 7 Sts.; Kimika
Industrial Sales and Dimayuga Hospital in Sta. Ana.



BETWEEN 7:30AM and 8:00AM AND THEN BETWEEN 1:00PM AND 1:30PM –
PORTION OF CIRCUITS PANDACAN 13M; AND STA. MESA 41F – STA. ANA 45VN –
PANDACAN 48M
Portion of New Panaderos St. from San Roque to Begonia Sts.
including F. Manalo, F. Roxas, Castañeda and Lamayan Sts.; Puregold
Supermarket – Sta. Ana, Sta. Ana District 6 Hospital and Mercury Drug
Store in Sta. Ana; Dalisay and Damayan Sts. in Sta. Mesa; Baretto
Subd. in Pandacan.



BETWEEN 7:30AM AND 1:30PM – PORTION OF CIRCUIT PANDACAN 13M; AND THE
WHOLE OF CIRCUIT STA. MESA 41F – STA. ANA 45VN – PANDACAN 48M
Portion Lubiran St. from Meralco - Pandacan substation to
Dalisay St. in Sta. Mesa.


REASON: Various maintenance works along Lubiran St. in Sta. Mesa
Manila.

WEDNESDAY, SEPTEMBER 19, 2012
LAGUNA (LOS BAÑOS)
BETWEEN 12:01AM AND 2:00AM – PORTION OF CIRCUIT LOS BAÑOS 34WT
Portion of Lopez Ave. from Demarces Village to and including
Los Baños Doctor's Hospital; Lopez Subd., Umali Subd., Sta. Fe Subd.;
and Sitio Maligaya in Bgys. San Antonio and Batong Malake.
Portion of Kaunlaran St. from Silangan Road to and including
Faculty Village; McDonald's, Land Bank of the Philippines; and Groove
St. in Bgy. Batong Malake.

REASON: Relocation of facilities and other line works along Lopez
Ave., Bgy. Batong Malake, Los Baños, Laguna.

MAKATI CITY
BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM –
PORTION OF CIRCUIT URDANETA 432VS
Portion of Makati Ave. and Paseo De Roxas St. from BDO South
Tower to and including Citibank Tower, Citibank Center, Peninsula
Court Bldg., BDO Plaza (PDCP Bank Center) and Gercon Plaza in Salcedo
Village, Bgy. Bel Air.

REASON: Relocation and conversion of primary facilities from
overhead to underground along Paseo De Roxas St. in
Salcedo Village, Bgy. Bel Air, Makati City.

THURSDAY TO FRIDAY, SEPTEMBER 20 - 21, 2012
BATANGAS PROVINCE (STO. TOMAS)
BETWEEN 11:00PM AND 11:30PM (THU., 09/20/12) AND THEN BETWEEN 3:30AM
AND 4:00AM (FRI., 09/21/12) – PORTION OF CIRCUIT SAN PABLO - II 47WJ
Portion of Maharlika Highway from near Cabaong Bridge to and
including Autocenter, Gencars, YKK Philippines, Kemeny Asia, Welgro
Feeds; Camella – Sto. Tomas Subd.; and Sampalukan St. in Bgys. San
Miguel, San Bartolome and San Roque.

BETWEEN 11:00PM (THU., 09/20/12) AND 4:00AM (FRI., 09/21/12) –
PORTION OF CIRCUIT SAN PABLO - II 47WJ
Portion of Maharlika Highway from near Kapt. Juan Villegas St.
to and including San Miguel St.; Portello Subd. and Imperial South
Meadows Subd. in Bgys. San Miguel, San Vicente and San Pedro.

REASON: Relocation of facilities affected by DPWH road widening
project along Maharlika Highway near Cabaong Bridge in
Sto. Tomas, Batangas Province.

SUNDAY, SEPTEMBER 23, 2012
MANILA; AND QUEZON CITY
BETWEEN 8:00AM AND 8:45AM AND THEN BETWEEN 12:15PM AND 1:00PM –
PORTION OF CIRCUIT STA. MESA 56F – LA LOMA 46VB
Portion of D. Tuazon St. from E. Rodriguez Sr. Ave. to Sen.
Mariano J. Cuenco Sr. St. including Kitanlad St.; and Jollibee
Restaurant – Welcome Rotonda in Bgy. Doña Josefa,
Portion of Sen. Mariano J. Cuenco Sr. from D. Tuazon St. in
Bgy. Lourdes, Quezon City to A. M. Maceda St. in Sampaloc, Manila
including Speaker E. Perez, Iba and Baco Sts. in Bgy. Sta. Teresita,
Quezon City.
Portion of Ibarra St. from Dapitan to Makiling Sts. including
Dr. Alejandro Albert Elementary School in Sampaloc, Manila.

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT STA. MESA 56F – LA
LOMA 46VB
Portion of D. Tuazon St. from N. Ramirez St. to E. Rodriguez
Sr. Ave. including Liberation, V. Ilustre, Lourdes Castillo, Data,
Sto. Tomas and Matimyas Sts.; and New Jerusalem School in Bgy. Don
Manuel, Quezon City.

REASON: Relocation of facilities along Sobriedad Ext. corner N.
Ramirez St. in Bgy. Don Manuel, Quezon City.

BATANGAS (BATANGAS CITY)
BETWEEN 8:00AM AND 5:00PM – THE WHOLE OF CIRCUITS MAHABANG PARANG
32WZ; NGCP – BOLBOC 32ZZ AND 33ZZ
Sitio Santa Rita Ilaya in Bgys. Santa Rita Karsada and Soro
Soro Karsada.
Portion of Batangas City – San Jose National Road from Meralco
– Mahabang Parang substation to and including Sitios Kanluran, Ilaya
and Ibaba, Bgys. Bucal, Concepcion and Mahabang Parang.

REASON: NGCP Preventive maintenance works at NGCP Batangas -
Bolboc 69kV transmission line.




MERALCO exerts all efforts to restore electric service as scheduled.
However, there are instances when due to unavoidable circumstances,
restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone
nos. 16211 / 631-1111, fax nos. 1622-8554 / 1622-8556, or e-mail address
callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries,
please use the Bill ID Number or Service Identification Number (SIN)
indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply
write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase
"Request for weekly schedule".




VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph




*Additional PPI
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.