Monday, March 3, 2014

MERALCO Maintenance Schedule for March 3 - 9, 2014 (Grp2) (Sent by: Janice V. De Asis)

=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------

Attached is the schedule of our pre-arranged power interruptions for March 3 to 9, 2014.  This serves as a general information guide and should not be directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word "Unsubscribe".

Thank you very much.



MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:


MONDAY TO TUESDAY, MARCH 3 – 4, 2014
QUEZON CITY (BALINTAWAK); AND CALOOCAN CITY
    BETWEEN 11:00PM AND 11:30PM (MON., 03/03/14) AND THEN BETWEEN 5:30AM AND 6:00AM (TUE., 03/04/14) – PORTION OF CIRCUITS BALINTAWAK 43E AND 51E
    Portion of Epifanio Delos Santos Ave. (EDSA) Northbound from Meralco – Balintawak substation along Howmart Road to Balintawak Cloverleaf including Eulogia St. and Oliveros Drive; NGCP Control House, Wilcon Builders Depot, Emerald Vinyl Corp., Quality Container Corp., Superv Chassis Warehouse, Rainforest Mineral Water, Mitsubishi Motors - Balintawak, Distilleria Limtuaco Bldg., Goodyear Steelpipe, Fabricator Philippines, Hi-Ace Industries Wire Corp., Honda Cars Service Depot, Minima Motors, Ozigo Lumber, Papercon Philippines, Shang-Li Plastic and Acme Electrical Manufacturing in Bgys. Apolonio Samson and Unang Sigaw, Quezon City.
    Portion of North Luzon Expressway (NLEX) East Service Road and Quirino Highway from Balintawak Cloverleaf to and including Gana Compound; Times Paint Manufacturing, Pacific Mills and Pinehurst Industrial Manufacturing in Bgys. Unang Sigaw and Balong Bato, Qeuzon City.

    BETWEEN 11:00PM (MON., 03/03/14) AND 6:00AM (TUE., 03/04/14) – PORTION OF CIRCUITS BALINTAWAK 43E AND 51E
    Portion of Epifanio Delos Santos Ave. (EDSA) Northbound from Balintawak Cloverleaf to F. Aguilar St. including Katipunan St.; Universal Smelting, New Dickson Paper Products and Jollibee Restaurant in Bgy. Bagong Barrio, Caloocan City.

    REASON: Relocation of facilities and other maintenance works along Epifanio Delos Santos Ave. (EDSA) Northbound in Bgy. Bagong Barrio, Caloocan City.

TUESDAY, MARCH 4, 2014
LAGUNA (SAN PEDRO)
    BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT SAN PEDRO 425WH
    Portion of Victoria Ave. from near Magsaysay Road to and including Villa Ricardo Subd. in Bgy. San Antonio.
    REASON: Replacement of poles and other line re-conductoring works along Victoria Ave. in Bgy. San Antonio, San Pedro, Laguna.

WEDNESDAY, MARCH 5, 2014
**LAGUNA (SAN PABLO CITY)
    BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT SAN PABLO 43WJ
    Portion of Camia St. from Maharlika Highway to and including NHA Subd., Richwood Park Village, Aranville Subd., Greenvalley Subd., Magcase Ville Subd., Sampaguita St.; Blue Danube School, San Pablo City Hospital, Kojie San Manufacturing, Universal Robina Corp., Dalubhasaan ng Lungsod ng San Pablo, Pharmawealth Laboratories and Malaonod Pumping Station in Bgys. San Francisco, San Jose, Sto. Cristo and San Pablo City proper.

    REASON: Replacement of rotten poles and cross-arms at various areas in Bgys. San Francisco, San Jose and Sto. Cristo in San Pablo City, Laguna.
THURSDAY, MARCH 6, 2014
CAVITE (SILANG)
    BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT DASMARIÑAS 43DA
    The whole of Bgy. Bulihan excluding Greenway Business Park.

    REASON: Line reconstruction works in Bgy. Bulihan, Silang, Cavite.
MANILA
    BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 3:00PM AND 4:00PM – THE WHOLE OF CIRCUITS BINONDO 19N; NORTH PORT 12H; AND PALOMAR 13L, 15L, 17L AND 18L
    Portion of Dagupan St. from Meralco - North Port substation to Claro M. Recto Ave. including PNR Cpd.; Arqueros, Cabezas, Francisco, Gerona, Nicolas Zamora, Coral, G. Perfecto, Malong, R. A. Reyes and Sta. Maria Sts. in Tondo.
    Portion of A. Rivera St. from Tayuman St. to Claro M. Recto Ave. including Mayhaligue, Narra, P. Algue, C. La Torre and F. Ma. Guerrero Sts. in Tondo.
    Portion of Jose Abad Santos Ave. and Reina Regente St. from P. Algue St. to near Plaza Lorenzo Ruiz including Alvarado, Felipe II and Soler Sts. in Binondo.
    Portion of Claro M. Recto Ave. from Reina Regente St. to near Sevilla St. including Alburquerque, Asuncion, Bilbao, Camba, Carmen Planas, J. Nolasco, Lakandula, Maria Payo, Morga, Ortega, P. Herrera, Padre Rada, San Ramon, Sandico, Soliman, Sta. Maria, Tuazon, Wagas and Zaragoza Sts. in Binondo, San Nicolas and Tondo.

    REASON: Preventive maintenance and testing works inside Meralco – Palomar substation.
LAGUNA (SAN PEDRO)
    BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT SAN PEDRO 425WH
    Portion of Victoria Ave. from near Villa Ricardo Subd. to and including Camella Homes Woodhills Subd. in Bgy. San Antonio.
    REASON: Replacement of poles and other line re-conductoring works along Victoria Ave. in Bgy. San Antonio, San Pedro, Laguna.

FRIDAY TO SATURDAY, MARCH 7 - 8, 2014
CALOOCAN CITY (NORTH)
    BETWEEN 11:00PM (FRI., 03/07/14) AND 4:00AM (SAT., 03/08/14) – PORTION OF CIRCUIT KAYBIGA 45YX
    Portion of Deparo and Bagumbong Roads from Cabatuhan Road to and including Seville Subd., Carlisle Mansions Phase 2, Evergreen Village Phases 1, 2 & 4, Fairway Lane – TNR IV C, Karina Subd., Metropolis North Subd., Neo Vista Homes, North Caloocan Village, North Crest Village, Parkview Heights, Rainbow Village 5, Recomville 2, Siena Villas, Solar Townhomes North, Solar Urban Homes North Phases I & II, Tierra Nova Subd., Tierra Nova Royal III Subd., Tierra Nova Royale Phases 1, 2, 2-D & 3-B, Villa Luisa North Phases 1, 2  and 3; Bagumbong Dulo, Bagumbong Taas, Casa Asuncion, Sampaloc and Victory Sts. in Bgy. Bagumbong.

    REASON: Various maintenance works along Deparo and Bagumbong Roads in Bgy. Bagumbong, Caloocan City (North).

SATURDAY, MARCH 8, 2014
CALOOCAN CITY (NORTH)
    BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT CAMARIN 435TC
    NHC – Tala Estate Subd. in Bgy. Tala.

    REASON: Line reconstruction works along Alat Bridge in Bgy. Tala, Calcoocan City (North).

SUNDAY, MARCH 9, 2014
MANILA (SAN MIGUEL)
    BETWEEN 8:00AM AND 9:00AM AND THEN BETWEEN 11:00PM AND 11:59PM – THE WHOLE OF CIRCUIT TEGEN 52B
    Tanduay Distillers and Hospicio De San Jose.
    REASON: Maintenance works inside Meralco – Tegen substation.
    MERALCO exerts all efforts to restore electric service as scheduled. However, there are instances when due to unavoidable circumstances, restoration may extend beyond the published schedule.
    For more information, please contact our CALL CENTER at telephone no. 16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries, please use the Bill ID Number or Service Identification Number (SIN) indicated in your electric bills.
    For those who prefer to receive this schedule via e-mail, simply write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule".



    VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
    www.meralco.com.ph



    **Revised PPI (changes already incorporated)

    Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative.  If erroneously sent or received, please do not open and delete the same from your system.  Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.