=======================================================================
WELCOME TO MERALCO'S MAINTENANCE SCHEDULE VIA E-MAIL
------------------------------------------------------------------------------------------------------------------
Attached is the schedule of our pre-arranged power interruptions for April 20 to 26, 2015. This serves as a general information guide and should not be directly construed as an interruption advisory to the e-mail recipients.
Please call us at telephone numbers 16211 or 631-1111 for verification of power interruption schedule.
If you wish to unsubscribe, please send us an e-mail and type in the word "Unsubscribe".
Thank you very much.
To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:
MONDAY TO TUESDAY, APRIL 20 – 21, 2015
- BETWEEN 11:00PM (MON., 04/20/15) AND 4:00AM (TUE., 04/21/15) - PORTION OF CIRCUIT LEGASPI 431RA
Portion of Dela Rosa St. from Don Jacinto Bldg. to Adelantado St. in Legaspi Village.
REASON: Relocation of primary facilities along Dela Rosa St. in Legaspi Village, Bgy. San Lorenzo, Makati City.
TUESDAY TO WEDNESDAY, APRIL 21 – 22, 2015
- BETWEEN 11:30PM AND 11:59PM (TUE., 04/21/15) AND THEN BETWEEN 4:00AM AND 4:30AM (WED., 04/22/15) – PORTION OF CIRCUIT MALIBAY 413VJ – PARAÑAQUE 43ZJ
Portion of NAIA Road from near Caltex Gas Station to Quirino Ave. including Tambo Realty Corp. in Pasay City.
Portion of Quirino Ave. from NAIA Road to Bayside Court St. including Riverview Compound; Riverside and M. Delos Santos Sts.; Makati Auto Center and Port Net Logistics in Bgy. Tambo, Parañaque City.
BETWEEN 11:30PM (TUE., 04/21/15) AND 4:30AM (WED., 04/22/15) – PORTION OF CIRCUIT MALIBAY 413VJ – PARAÑAQUE 43ZJ
Portion of NAIA Road from Caltex Gas Station to near Cebu Pacific including Petroleum Distributors & Services Corporation in Pasay City.
REASON: Line reconstruction works along NAIA Road in Pasay City.
SUNDAY, APRIL 26, 2015
- BETWEEN 8:00AM AND 8:30AM AND THEN BETWEEN 12:30PM AND 1:00PM – PORTION OF CIRCUIT TEGEN 57B
Portion of Antonio Vasquez St. from San Andres St. to Julio Nakpil St. including Vermont Tower; Remedios, Pilar Hidalgo Lim and Luis Ma. Guerrero Sts.
BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUITS MALATE 23J; AND TEGEN 57B
Portion of San Andres St. from M. H. Del Pilar St. to and including San Andres Sports Complex and Malate Crowne Plaza.
Portion of M. Adriatico St. from Remedios St. to San Andres St.
Portion of A. Mabini St. from near San Andres St. to and including Hyung Jae Corporation.
REASON: Replacement of rotten pole along San Andres St. corner A. Mabini St. in Malate, Manila.
- BETWEEN 8:00AM AND 3:00PM – PORTION OF CIRCUIT FPIP 423WW
One feed of Sunpower Phils. Manufacturing in First Philippine Industrial Park, Bgy. Tanauan.
REASON: Preventive maintenance and testing works inside Meralco – FPIP substation.
For more information, please contact our CALL CENTER at telephone no. 16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries, please use the Bill ID Number or Service Identification Number (SIN) indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule".
*Additional PPI
Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative. If erroneously sent or received, please do not open and delete the same from your system. Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.